Do you have any question about this error?
Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 259
Message text: No actual activity price calculation planned
Plan activity prices are used for all actual allocations in controlling
area &V1&, fiscal year &V2&, version &V3&. A fully-iterative actual
activity price is not to be calculated.
The SAP System cannot calculate actual prices because there are no new
activity prices to be calculated.
Processing is not executed.
Check the settings for version &V3&. If you want to calculate actual
prices, you must use <ZH>Fiscal year setting</> in <ZH>Detail</>:
Set the "Purely iterative activty price" indicator.
Alternately, set the "Valuation with actual prices" indicator to 1
(revaluation with user-defined transaction) or 2 (revaluation with
original transaction).
In each case, revaluation of actual activities is executed, but
revaluation with the original transaction results in the variance
between actual and plan activity price allocation being no longer
identifiable.
Error message extract from SAP system. Copyright SAP SE.
KP259
- No actual activity price calculation planned ?The SAP error message KP259 ("No actual activity price calculation planned") typically occurs in the context of controlling (CO) when you are trying to perform a transaction that requires actual activity price calculations, but the system cannot find any planned activity prices for the specified period or cost center.
Causes:
- Missing Planning Data: The most common cause is that there is no planned activity price set for the relevant cost center or activity type for the period in question.
- Incorrect Period: The period for which you are trying to execute the transaction may not have any planned prices defined.
- Activity Type Not Defined: The activity type you are trying to use may not have been defined or assigned correctly in the system.
- Cost Center Not Active: The cost center may not be active for the period you are trying to process.
- Configuration Issues: There may be configuration issues in the controlling module that prevent the system from calculating the actual activity price.
Solutions:
Check Planning Data:
- Go to the planning transaction (e.g., KP06) and check if the planned activity prices for the relevant cost center and activity type exist for the required period.
- If they do not exist, you will need to enter the planned prices.
Verify Period Settings:
- Ensure that you are working within the correct period. Check the fiscal year and period settings in your transaction.
Review Activity Type Configuration:
- Ensure that the activity type is correctly defined and assigned to the cost center. You can check this in the configuration settings for controlling.
Activate Cost Center:
- Make sure that the cost center is active for the period you are trying to process. You can check the status of the cost center in the master data.
Consult Configuration:
- If you suspect configuration issues, consult with your SAP CO module configuration team to ensure that all necessary settings are correctly configured.
Run Reports:
- Use reports like S_ALR_87013611 (Cost Centers: Actual/Plan/Variance) to analyze the data and see if there are discrepancies in the planning.
Related Information:
By following these steps, you should be able to identify the cause of the KP259 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
KP256
Cost component structure for component split is not active
What causes this issue? Price calculation, according to the entry in version &V2&, should be carried out with component layering (cost compon...
KP255
Cost component structure for component split does not exist
What causes this issue? Price calculation, according to the entry in version &V2&, should be carried out with component layering (cost compon...
KP260
Planning locked by user &
What causes this issue? DEFINE &USER& = &V1& INCLUDE MESSAGE_ENQUEUE_USER OBJECT DOKU ID TX User &V1& is planning in controll...
KP261
Process special periods and normal periods separately
What causes this issue? You called up activity price calculation for periods &V3& through &V4&. This period range in fiscal year vari...
Click on this link to search all SAP messages.