Do you have any question about this error?
Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 256
Message text: Cost component structure for component split is not active
Price calculation, according to the entry in version &V2&, should be
carried out with component layering (cost component layout &V1&).
However, the layout is not activated.
Price calculation proceeds without component layering.
Check the cost component layout stored in the version, and activate it
if necessary.
Error message extract from SAP system. Copyright SAP SE.
KP256
- Cost component structure for component split is not active ?The SAP error message KP256, which states "Cost component structure for component split is not active," typically occurs in the context of controlling (CO) and product costing. This error indicates that the cost component structure required for splitting costs into different components (like material costs, labor costs, overheads, etc.) is not active or properly configured in the system.
Cause:
- Inactive Cost Component Structure: The cost component structure that is supposed to be used for the component split is not activated in the system.
- Configuration Issues: There may be issues in the configuration of the cost component structure or the assignment of the structure to the relevant controlling area or cost object.
- Missing Assignments: The cost component structure may not be assigned to the relevant controlling area or may not be linked to the material or cost object being processed.
Solution:
To resolve the KP256 error, follow these steps:
Check Cost Component Structure:
- Go to the transaction code OKTZ (Cost Component Structure).
- Verify if the cost component structure you are trying to use is active. If it is not, you will need to activate it.
Activate Cost Component Structure:
- If the structure is inactive, you can activate it by selecting the structure and choosing the option to activate it.
Assign Cost Component Structure:
- Ensure that the cost component structure is assigned to the relevant controlling area. You can check this in the configuration settings under Controlling > Cost Element Accounting > Master Data > Cost Component Structure.
Check Configuration:
- Review the configuration settings for the cost component structure to ensure that it is correctly set up for the intended use. This includes checking the cost components defined within the structure.
Review Material Master:
- If the error occurs during material costing, check the material master data to ensure that the correct cost component structure is assigned.
Consult Documentation:
- If you are unsure about the configuration steps, refer to SAP documentation or consult with your SAP support team for guidance.
Related Information:
By following these steps, you should be able to resolve the KP256 error and ensure that your cost component structure is properly configured and active.
Get instant SAP help. Start your 7-day free trial now.
KP255
Cost component structure for component split does not exist
What causes this issue? Price calculation, according to the entry in version &V2&, should be carried out with component layering (cost compon...
KP254
No activities have been posted
What causes this issue? No activity consumption was posted in controlling area &V1& in fiscal year &V2&.System Response Actual price...
KP259
No actual activity price calculation planned
What causes this issue? Plan activity prices are used for all actual allocations in controlling area &V1&, fiscal year &V2&, version ...