Message type: E = Error
Message class: KOPV - Messages for Plan Version Copying
Message number: 009
Message text: No exchange rate type could be determined for WBS element &1
Currency translation requires an exchange rate type.
There is no exchange rate type in the planning profile assigned to WBS
element &V1& by means of order type &V2&. For this reason, the system
tries to determine the exchange rate type from the settings for the
target version, &V3&, for the current fiscal year. However, version
&V3& is not defined for the current fiscal year in controlling area
&V4&.
The year-independent plan values in WBS element &V1& cannot be copied
into target version &V3&.
Enter an exchange rate type in the appropriate planning profile or
maintain the settings in the target version &V3& in controlling area
&V4& for the current fiscal year.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KOPV009
- No exchange rate type could be determined for WBS element &1 ?The SAP error message KOPV009 indicates that the system is unable to determine an exchange rate type for a specific Work Breakdown Structure (WBS) element. This typically occurs in the context of project accounting or controlling when dealing with foreign currency transactions.
Cause:
- Missing Exchange Rate Type: The exchange rate type required for the transaction is not defined in the system.
- Configuration Issues: The exchange rate type may not be properly configured in the system settings.
- WBS Element Settings: The WBS element may not have the necessary settings or attributes defined to allow for currency conversion.
- Currency Settings: The currency settings for the project or WBS element may not align with the exchange rate type being used.
- Date Issues: The date of the transaction may not fall within the valid range for the exchange rate type.
Solution:
Check Exchange Rate Type Configuration:
- Go to the transaction code
OB08
to check the exchange rate types defined in the system.- Ensure that the required exchange rate type is maintained and has valid rates for the relevant currencies.
Review WBS Element Settings:
- Use transaction code
CJ20N
orCJ02
to check the settings of the WBS element.- Ensure that the currency settings are correctly defined and that the WBS element is set up to handle the required currencies.
Verify Currency Settings:
- Check the currency settings for the project and ensure that they are consistent with the exchange rate type being used.
- Ensure that the currency of the WBS element matches the currency of the transaction.
Check Validity of Exchange Rates:
- Ensure that the exchange rates are valid for the date of the transaction. If the transaction date is outside the range of valid rates, you may need to update the rates.
Consult Documentation:
- Review SAP documentation or consult with your SAP support team for any specific configurations related to your organization's setup.
Related Information:
Transaction Codes:
OB08
: Maintain exchange rates.CJ20N
: Project management (to view and edit WBS elements).CJ02
: Change WBS element.SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance.
User Roles and Authorizations: Ensure that the user has the necessary authorizations to view and edit exchange rates and WBS elements.
By following these steps, you should be able to identify the root cause of the KOPV009 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
KOPV008
No exchange rate type could be determined for order &1
What causes this issue? Currency translation requires an exchange rate type. There is no exchange rate type in the planning profile assigned to order...
KOPV007
No valid plan profile could be determined for project &1
What causes this issue? No valid planning profile has been entered for project &V1&.System Response Overall plan values and the unit costing...
KOPV010
Fiscal year interval adapted by the system
What causes this issue? To improve system performance, the fiscal year interval has been adapted to the validity duration of the source and target ve...
KOPV011
WBS Element &1: Planning currency &4 is not possible
What causes this issue? You chose &V4& as the leading planning currency when copying the plan. For project &V1& however, &V3&...