How To Fix KOPV011 - WBS Element &1: Planning currency &4 is not possible


KOPV011 - Overview

  • Message type: E = Error

  • Message class: KOPV - Messages for Plan Version Copying

  • Message number: 011

  • Message text: WBS Element &1: Planning currency &4 is not possible

  • Show details Hide details
  • What causes this issue?

    You chose &V4& as the leading planning currency when copying the plan.
    For project &V1& however, &V3& was specified as the planning currency
    for overall planning and unit costing in planning profile &V2&.

    System Response

    Overall planning and unit costing cannot be copied.

    How to fix this error?

    Choose an appropriate leading currency as the planning currency for
    copying the plan version.
    If the 'controlling area currency' is set as the planning currency in
    the plan profile, you can use the settings 'controlling area currency'
    and 'transaction currency' as the leading currency for overall planning
    and unit costing.
    If the 'object currency' is set as the planning currency in the plan
    profile, you can use the settings 'object currency' and 'transaction
    currency' as the leading currency for overall planning and unit
    costing.
    If the 'transaction currency' is set as the planning currency in the
    plan profile, you can use the setting 'transaction currency' as the
    leading currency for overall planning and unit costing.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


KOPV011 - Details

  • The SAP error message KOPV011 indicates that there is an issue with the planning currency for a Work Breakdown Structure (WBS) element. Specifically, it states that the planning currency specified for the WBS element is not valid or not possible for the given context.
    
    Cause: Currency Configuration: The planning currency for the WBS element may not be configured correctly in the system. This can happen if the currency is not defined in the controlling area or if it does not match the currency settings of the project. WBS Element Settings: The WBS element may have been set up with a currency that is not allowed for planning purposes. Master Data Issues: There may be inconsistencies in the master data related to the WBS element, such as the project definition or the controlling area settings. Currency Type: The currency type used for planning might not be compatible with the settings of the WBS element.
    Solution: Check WBS Element

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


KOPV011 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant