Message type: E = Error
Message class:  KOPV - Messages for Plan Version Copying 
Message number: 011
Message text: WBS Element &1: Planning currency &4 is not possible
You chose &V4& as the leading planning currency when copying the plan.
For project &V1& however, &V3& was specified as the planning currency
for overall planning and unit costing in planning profile &V2&.
Overall planning and unit costing cannot be copied.
Choose an appropriate leading currency as the planning currency for
copying the plan version.
If the 'controlling area currency' is set as the planning currency in
the plan profile, you can use the settings 'controlling area currency'
and 'transaction currency' as the leading currency for overall planning
and unit costing.
If the 'object currency' is set as the planning currency in the plan
profile, you can use the settings 'object currency' and 'transaction
currency' as the leading currency for overall planning and unit
costing.
If the 'transaction currency' is set as the planning currency in the
plan profile, you can use the setting 'transaction currency' as the
leading currency for overall planning and unit costing.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message KOPV011 indicates that there is an issue with the planning currency for a Work Breakdown Structure (WBS) element. Specifically, it states that the planning currency specified for the WBS element is not valid or not possible for the given context.
Cause: Currency Configuration: The planning currency for the WBS element may not be configured correctly in the system. This can happen if the currency is not defined in the controlling area or if it does not match the currency settings of the project. WBS Element Settings: The WBS element may have been set up with a currency that is not allowed for planning purposes. Master Data Issues: There may be inconsistencies in the master data related to the WBS element, such as the project definition or the controlling area settings. Currency Type: The currency type used for planning might not be compatible with the settings of the WBS element.
Solution: Check WBS Element
 Get instant SAP help. Sign up for our Free Essentials Plan.
Get instant SAP help. Sign up for our Free Essentials Plan. 
KOPV010 Fiscal year interval adapted by the system
What causes this issue?  To improve system performance, the fiscal year interval has been adapted to the validity duration of the source and target ve...
KOPV009 No exchange rate type could be determined for WBS element &1
What causes this issue?  Currency translation requires an exchange rate type. There is no exchange rate type in the planning profile assigned to WBS e...
KOPV012 Order &1: Planning currency &4 is not possible
What causes this issue?  When copying the plan, you chose &V4& as the leading planning currency. For order &V1& however, you specified...