Do you have any question about this error?
Message type: E = Error
Message class: KOPV - Messages for Plan Version Copying
Message number: 011
Message text: WBS Element &1: Planning currency &4 is not possible
You chose &V4& as the leading planning currency when copying the plan.
For project &V1& however, &V3& was specified as the planning currency
for overall planning and unit costing in planning profile &V2&.
Overall planning and unit costing cannot be copied.
Choose an appropriate leading currency as the planning currency for
copying the plan version.
If the 'controlling area currency' is set as the planning currency in
the plan profile, you can use the settings 'controlling area currency'
and 'transaction currency' as the leading currency for overall planning
and unit costing.
If the 'object currency' is set as the planning currency in the plan
profile, you can use the settings 'object currency' and 'transaction
currency' as the leading currency for overall planning and unit
costing.
If the 'transaction currency' is set as the planning currency in the
plan profile, you can use the setting 'transaction currency' as the
leading currency for overall planning and unit costing.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KOPV011
- WBS Element &1: Planning currency &4 is not possible ?The SAP error message KOPV011 indicates that there is an issue with the planning currency for a Work Breakdown Structure (WBS) element. Specifically, it states that the planning currency specified for the WBS element is not valid or not possible for the given context.
Cause:
- Currency Configuration: The planning currency for the WBS element may not be configured correctly in the system. This can happen if the currency is not defined in the controlling area or if it does not match the currency settings of the project.
- WBS Element Settings: The WBS element may have been set up with a currency that is not allowed for planning purposes.
- Master Data Issues: There may be inconsistencies in the master data related to the WBS element, such as the project definition or the controlling area settings.
- Currency Type: The currency type used for planning might not be compatible with the settings of the WBS element.
Solution:
- Check WBS Element Configuration: Verify the currency settings for the WBS element in the project definition. Ensure that the planning currency is correctly defined and is allowed for the WBS element.
- Review Controlling Area Settings: Check the controlling area settings to ensure that the planning currency is defined and that it matches the currency of the WBS element.
- Adjust Currency Type: If necessary, change the currency type used for planning to one that is compatible with the WBS element.
- Update Master Data: If there are inconsistencies in the master data, update the relevant records to ensure that the currency settings are correct.
- Consult Documentation: Refer to SAP documentation or consult with your SAP support team for specific configuration steps related to currency settings in your version of SAP.
Related Information:
CJ20N
(Project Builder) or CJ02
(Change WBS Element) to check and modify the WBS element settings.By following these steps, you should be able to identify the root cause of the KOPV011 error and implement the necessary changes to resolve it.
Get instant SAP help. Start your 7-day free trial now.
KOPV010
Fiscal year interval adapted by the system
What causes this issue? To improve system performance, the fiscal year interval has been adapted to the validity duration of the source and target ve...
KOPV009
No exchange rate type could be determined for WBS element &1
What causes this issue? Currency translation requires an exchange rate type. There is no exchange rate type in the planning profile assigned to WBS e...
KOPV012
Order &1: Planning currency &4 is not possible
What causes this issue? When copying the plan, you chose &V4& as the leading planning currency. For order &V1& however, you specified...
KOPV100
Unit costing
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.