Message type: E = Error
Message class: KOPV - Messages for Plan Version Copying
Message number: 007
Message text: No valid plan profile could be determined for project &1
No valid planning profile has been entered for project &V1&.
Overall plan values and the unit costing cannot be copied for the WBS
elements in project &V1&.
Check the planning profile entered in project definition &v1&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KOPV007
- No valid plan profile could be determined for project &1 ?The SAP error message KOPV007 ("No valid plan profile could be determined for project &1") typically occurs in the context of project management and controlling when the system is unable to find a valid planning profile for a specific project. This can happen for various reasons, and understanding the cause and potential solutions is essential for resolving the issue.
Causes:
- Missing Planning Profile: The project may not have an assigned planning profile, or the assigned profile may not be valid.
- Project Status: The project might be in a status that does not allow for planning or budgeting.
- Configuration Issues: There may be configuration issues in the project system settings or controlling area settings.
- Master Data Issues: The master data for the project (such as the project definition or WBS elements) may be incomplete or incorrect.
- Authorization Issues: The user may not have the necessary authorizations to access the planning profile.
Solutions:
Check Project Settings:
- Go to the project definition or WBS element in the Project System (PS) module and verify if a valid planning profile is assigned.
- If not, assign a valid planning profile that corresponds to the project type.
Review Planning Profile Configuration:
- Navigate to the configuration settings for planning profiles in the SAP system (Transaction code: OPUK).
- Ensure that the planning profile is correctly defined and that it is active.
Check Project Status:
- Ensure that the project is in a status that allows planning. If the project is closed or in a status that restricts planning, you may need to change its status.
Validate Master Data:
- Check the master data for the project to ensure that all required fields are filled out correctly and that there are no inconsistencies.
Authorization Check:
- Verify that the user has the necessary authorizations to access and modify the project planning profiles. This may involve checking user roles and permissions.
Consult Documentation:
- Review SAP documentation or help resources for additional insights into the specific planning profile requirements for your project type.
Related Information:
By following these steps, you should be able to identify the cause of the KOPV007 error and implement the appropriate solution.
Get instant SAP help. Sign up for our Free Essentials Plan.
KOPV006
No valid plan profile could be determined for order &1
What causes this issue? No valid planning profile has been entered in order type &V2& for order &V1&.System Response No overall pla...
KOPV005
Target version &1 must not be used
What causes this issue? Target version &V1& is an actual version or version 0. You must not use these versions as the target version.System R...
KOPV008
No exchange rate type could be determined for order &1
What causes this issue? Currency translation requires an exchange rate type. There is no exchange rate type in the planning profile assigned to order...
KOPV009
No exchange rate type could be determined for WBS element &1
What causes this issue? Currency translation requires an exchange rate type. There is no exchange rate type in the planning profile assigned to WBS e...