Do you have any question about this error?
Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 495
Message text: Planned costs = 0 --> method of apportionment not applicable (&,&)
Error message extract from SAP system. Copyright SAP SE.
KJ495
- Planned costs = 0 --> method of apportionment not applicable (&,&) ?The SAP error message KJ495, which states "Planned costs = 0 --> method of apportionment not applicable," typically occurs in the context of cost planning and allocation in SAP Controlling (CO) module, particularly when dealing with internal orders, cost centers, or projects.
Cause:
- Zero Planned Costs: The primary cause of this error is that the system has detected that the planned costs for a particular cost object (like an internal order or cost center) are set to zero. This means that there are no costs to allocate or apportion using the specified method.
- Incorrect Configuration: The method of apportionment (e.g., distribution, assessment) may not be applicable if there are no costs to distribute or assess.
- Missing Data: There may be missing or incomplete data in the cost planning process, leading to a situation where planned costs are not defined.
Solution:
- Check Planned Costs: Review the cost object (internal order, cost center, etc.) to ensure that planned costs are correctly entered. If they are zero, you need to update the planned costs to reflect the expected expenses.
- Adjust Apportionment Method: If the planned costs are indeed zero and you do not intend to allocate costs, consider using a different method of apportionment that does not require planned costs.
- Review Configuration: Ensure that the configuration for the cost allocation methods is set up correctly in the system. This includes checking the settings for the cost centers, internal orders, or projects involved.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the cost allocation methods and their requirements.
- Testing: After making adjustments, test the allocation process again to ensure that the error does not recur.
Related Information:
KSU5
(for cost center planning) or KO22
(for internal order planning) to check and update planned costs.By addressing the root cause of the zero planned costs and ensuring that the configuration aligns with your business processes, you should be able to resolve the KJ495 error effectively.
Get instant SAP help. Start your 7-day free trial now.
KJ494
Plan costs < actual costs. Method of apportionment not applicable (&,&)
What causes this issue? The system is attempting to apportion a reserve to line IDs. It uses the difference between planned costs and actual costs as...
KJ493
Method of apportionment O: Set RA type to E and profit indicator to M
What causes this issue? If the WIP or the reserves for unrealized costs are apportioned with method of apportionment O (revenue-based cost of goods m...
KJ496
Cost element &1 in controlling area &2 does not exist on &3
What causes this issue? In Customizing for the <DS:GLOS.3526B73EAFAB52B9E10000009B38F974>results analysis version</> or in Customizing fo...
KJ497
Time frame "&" not permitted. Set to " " (blank)
What causes this issue? In the valuation method, you have chosen a value for the Time Frame parameter that is not "_". This is not possible...
Click on this link to search all SAP messages.