Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 394
Message text: Results res. F: Make entry in "Line ID costs" in valuation methods
In the valuation method, you selected results reserve <ZH>F</> (results
reserve through revenue percentage, increase breakdown structure
costs). With this method you must specify not only a revenue percentage
but also the <DS:GLOS.line_ID>line ID</> under which the breakdown
structure costs are updated.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Go into Customizing in the valuation method and specify a line ID in
the field <LS>Line ID costs</>.
Error message extract from SAP system. Copyright SAP SE.
KJ394
- Results res. F: Make entry in "Line ID costs" in valuation methods ?The SAP error message KJ394, which states "Results res. F: Make entry in 'Line ID costs' in valuation methods," typically occurs in the context of Profitability Analysis (CO-PA) when you are trying to post or process results that require specific configuration in the valuation methods.
Cause: This error usually arises due to the following reasons: Missing Configuration: The valuation method for the line item in question is not properly configured. Specifically, the "Line ID costs" field is not filled in the valuation method settings. Incorrect Settings: The settings for the valuation method may not align with the requirements of the posting or the data being processed. Data Entry Issues: There may be missing or incorrect entries in the relevant master data or transaction data that are required for the valuation method to function correctly.
Solution: To resolve the KJ394 error, you can follow these steps: Check Valuation Method Configuration: Go to the configuration settings for Profitability Analysis (CO-PA). Navigate to
Get instant SAP help. Sign up for our Free Essentials Plan.
KJ393
Do not use profit indicator R with profit basis &
What causes this issue? You selected profit basis &V1& in the valuation method. This profit basis cannot be used with profit indicator <ZH...
KJ392
Use profit indicator "R" with valuation basis O, Q, or S
What causes this issue? Profit indicator <ZH>R</> (results analysis according to the <DS:GLOS.POC_method>POC method</> with p...
KJ395
Do not use results reserve & with profit basis &
What causes this issue? You selected profit basis &V2& in the valuation method. This profit basis cannot be used with results reserve &V1...
KJ396
Do not use valuation basis 0 to 9 with profit basis X
What causes this issue? You selected profit basis <ZH>X</> (Customer Enhancement 2) in the valuation method. However, as the valuation ba...
Click on this link to search all SAP messages.