Do you have any question about this error?
Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 392
Message text: Use profit indicator "R" with valuation basis O, Q, or S
Profit indicator <ZH>R</> (results analysis according to the
<DS:GLOS.POC_method>POC method</> with profit realization according to
revenue planning) can only be used with the valuation bases <ZH>O</>
(planned costs, planned revenues), <ZH>Q</> (maximum of planned costs
and actual costs, planned revenues), and <ZH>S</> (maximum of planned
costs and cumulative actual costs, planned revenues).
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Go into Customizing and change the valuation basis in the valuation
method accordingly.
Error message extract from SAP system. Copyright SAP SE.
KJ392
- Use profit indicator "R" with valuation basis O, Q, or S ?The SAP error message KJ392 indicates that there is an issue with the profit indicator being used in conjunction with a specific valuation basis. This error typically arises in the context of Profitability Analysis (CO-PA) when the system expects a certain combination of profit indicators and valuation bases.
Cause:
The error occurs when:
To resolve this error, you can take the following steps:
Check Configuration:
Review Data Entry:
Consult Documentation:
Test with Different Combinations:
Contact SAP Support:
By following these steps, you should be able to identify the root cause of the KJ392 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
KJ391
Use profit indicator "R" only with results analysis type "E"
What causes this issue? Profit indicator <ZH>R</> (results analysis using the <DS:GLOS.POC_method>POC method</> with profit r...
KJ390
Version in valuation method set by system to 000
What causes this issue? In the valuation method, you entered a version for simulation that is not 000. The system replaced this version with version ...
KJ393
Do not use profit indicator R with profit basis &
What causes this issue? You selected profit basis &V1& in the valuation method. This profit basis cannot be used with profit indicator <ZH...
KJ394
Results res. F: Make entry in "Line ID costs" in valuation methods
What causes this issue? In the valuation method, you selected results reserve <ZH>F</> (results reserve through revenue percentage, incre...
Click on this link to search all SAP messages.