Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 316
Message text: Create a cost element for POC profit increase
If you are using the <DS:GLOS.POC_method>POC method</> to perform
revenue-based <DS:GLOS.results_analysis>results analysis</>, the system
calculates a profit increase and writes it under a results analysis
cost element.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Create a cost element for the profit increase.
Go into Customizing and enter the results analysis cost element in the
<DS:GLOS.results_analysis_version>results analysis version</>.
Error message extract from SAP system. Copyright SAP SE.
KJ316
- Create a cost element for POC profit increase ?The SAP error message KJ316, which states "Create a cost element for POC profit increase," typically occurs in the context of Project System (PS) or Controlling (CO) modules when there is an attempt to post a Profit and Loss (P&L) transaction related to a project without a corresponding cost element being defined for the Profit and Loss account.
Cause: Missing Cost Element: The primary cause of this error is that there is no cost element defined for the Profit and Loss account that is being used in the project. This can happen if the cost element has not been created or if it is not properly assigned to the relevant account.
Configuration Issues: There may be configuration issues in the controlling area or project settings that prevent the system from recognizing the cost element. Incorrect Account Assignment: The account assignment for the project may not be set up correctly, leading to the system not
Get instant SAP help. Sign up for our Free Essentials Plan.
KJ315
Create a cost element for revenue surplus
What causes this issue? If you are using the POC method to perform revenue-based results analysis, the system calculates a revenue surplus if the act...
KJ314
Create a cost element for revenue in excess of billings
What causes this issue? If you are using the POC method to perform results analysis, the system computes the calculated revenue by multiplying the pe...
KJ317
Create a cost element for POC profit reduction
What causes this issue? If you are using the <GL:POC_method>POC method</> to carry out results analysis, the profit in a period can resul...
KJ318
Create a cost element for POC loss creation
What causes this issue? If you are using the <DS:GLOS.POC_method>POC method</> to perform revenue-based <DS:GLOS.results_analysis>r...
Click on this link to search all SAP messages.