Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 298
Message text: In joint production, WIP must be calculated at actual costs
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KJ298
- In joint production, WIP must be calculated at actual costs ?The SAP error message KJ298, which states "In joint production, WIP must be calculated at actual costs," typically occurs in the context of joint production processes where Work in Progress (WIP) needs to be evaluated based on actual costs rather than standard costs. This error can arise in various scenarios, particularly when dealing with joint production and the associated cost accounting.
Cause:
- Costing Type Configuration: The error often indicates that the system is configured to use standard costing for WIP calculation in a joint production scenario, but the actual costing method is required.
- WIP Calculation Settings: The settings for WIP calculation in the controlling area or the specific production order may not be aligned with the requirements for joint production.
- Production Order Settings: The production order may not be set up correctly to handle joint production, leading to discrepancies in how costs are calculated.
- Cost Object Settings: The cost object (e.g., production order, process order) may not be configured to support actual costing for joint production.
Solution:
- Check Costing Type: Ensure that the costing type used for the production order is set to actual costing. You may need to adjust the settings in the controlling area or the production order.
- Adjust WIP Calculation Settings: Review the WIP calculation settings in the controlling area. Make sure that the settings allow for actual costing in joint production scenarios.
- Review Production Order Configuration: Verify that the production order is correctly configured for joint production. This includes checking the order type and ensuring that it supports actual costing.
- Cost Object Configuration: Ensure that the cost object settings are appropriate for joint production and that they are set to calculate WIP based on actual costs.
- Consult Documentation: Refer to SAP documentation or help resources for specific configuration steps related to joint production and WIP calculation.
Related Information:
If the issue persists after checking these areas, it may be beneficial to consult with an SAP expert or your organization's SAP support team for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
KJ297
Version &1 in CO area &2 can only be changed through version &3
What causes this issue? You are using <DS:GLOS.transfer_price>transfer prices</> and have defined two results analysis versions for multi...
KJ296
Dependent vers. for vers. with operational valuation included
What causes this issue? There are multiple results analysis versions of multiple valuation views for the <DS:GLOS.results_analysis_version>resu...
KJ299
Use of status change documents: Define cutoff period = D
What causes this issue? You are using a period-specific status for this object. For technical reasons, results analysis in one run is only possible f...
KJ300
Select suitable method for loss realization for revenue-based results ana
What causes this issue? In Customizing in the <LS>valuation method</>, you selected revenue-based <DS:GLOS.results_analysis>results...
Click on this link to search all SAP messages.