Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 300
Message text: Select suitable method for loss realization for revenue-based results ana
In Customizing in the <LS>valuation method</>, you selected
revenue-based <DS:GLOS.results_analysis>results analysis</>.
In revenue-based results analysis, you can realize a loss if:
Actual revenues or actual costs have been incurred
Actual revenues have been incurred
Actual revenues have been incurred and an actual loss was recognized
Cost of sales were created
You control this in the Expert Mode of the valuation method with the
<LS>Loss realization</> field.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Go into the Expert Mode of the valuation method and check the entry in
the <LS>Loss realization</> field.
Error message extract from SAP system. Copyright SAP SE.
KJ300
- Select suitable method for loss realization for revenue-based results ana ?The SAP error message KJ300, which states "Select suitable method for loss realization for revenue-based results analysis," typically occurs in the context of results analysis in SAP Controlling (CO) when there is an issue with how losses are being recognized for revenue-based results analysis.
Cause: This error can arise due to several reasons, including:
Configuration Issues: The results analysis method may not be properly configured in the system. This includes settings related to how losses are recognized and realized in the context of revenue-based results analysis. Missing Parameters: The necessary parameters for loss realization may not be set up in the controlling area or the specific project or order. Inconsistent Data: There may be inconsistencies in the data related to the project or order, such as missing or incorrect cost elements, which can lead to the inability to select a suitable method for loss realization. Incorrect Settings in the Results Analysis Version: The version of results
Get instant SAP help. Sign up for our Free Essentials Plan.
KJ299
Use of status change documents: Define cutoff period = D
What causes this issue? You are using a period-specific status for this object. For technical reasons, results analysis in one run is only possible f...
KJ298
In joint production, WIP must be calculated at actual costs
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KJ301
Select suitable method for loss realization for qty-based results analysi
What causes this issue? In Customizing in the <LS>valuation method</>, you selected quantity-based <DS:GLOS.results_analysis>result...
KJ302
Profit basis & cannot be used for planned results analysis
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.