Do you have any question about this error?
Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 300
Message text: Select suitable method for loss realization for revenue-based results ana
In Customizing in the <LS>valuation method</>, you selected
revenue-based <DS:GLOS.results_analysis>results analysis</>.
In revenue-based results analysis, you can realize a loss if:
Actual revenues or actual costs have been incurred
Actual revenues have been incurred
Actual revenues have been incurred and an actual loss was recognized
Cost of sales were created
You control this in the Expert Mode of the valuation method with the
<LS>Loss realization</> field.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Go into the Expert Mode of the valuation method and check the entry in
the <LS>Loss realization</> field.
Error message extract from SAP system. Copyright SAP SE.
KJ300
- Select suitable method for loss realization for revenue-based results ana ?The SAP error message KJ300, which states "Select suitable method for loss realization for revenue-based results analysis," typically occurs in the context of results analysis in SAP Controlling (CO) when there is an issue with how losses are being recognized for revenue-based results analysis.
Cause:
This error can arise due to several reasons, including:
Configuration Issues: The results analysis method may not be properly configured in the system. This includes settings related to how losses are recognized and realized in the context of revenue-based results analysis.
Missing Parameters: The necessary parameters for loss realization may not be set up in the controlling area or the specific project or order.
Inconsistent Data: There may be inconsistencies in the data related to the project or order, such as missing or incorrect cost elements, which can lead to the inability to select a suitable method for loss realization.
Incorrect Settings in the Results Analysis Version: The version of results analysis being used may not have the appropriate settings for loss realization.
Solution:
To resolve the KJ300 error, you can take the following steps:
Check Configuration:
- Go to the configuration settings for results analysis in SAP (Transaction code: OKG1 or OKG2).
- Ensure that the loss realization method is correctly defined for the relevant controlling area and results analysis version.
Review Results Analysis Version:
- Check the settings of the results analysis version being used (Transaction code: OKG2).
- Ensure that the version allows for loss realization and that the appropriate methods are selected.
Set Parameters:
- Ensure that all necessary parameters for loss realization are set up correctly in the project or order. This includes checking the settings in the project definition or order master data.
Data Consistency Check:
- Perform a consistency check on the data related to the project or order. Look for any missing or incorrect entries that could affect results analysis.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on configuring results analysis and loss realization methods.
Seek Help from SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.
Related Information:
By following these steps, you should be able to identify and resolve the issue causing the KJ300 error in SAP.
Get instant SAP help. Start your 7-day free trial now.
KJ299
Use of status change documents: Define cutoff period = D
What causes this issue? You are using a period-specific status for this object. For technical reasons, results analysis in one run is only possible f...
KJ298
In joint production, WIP must be calculated at actual costs
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KJ301
Select suitable method for loss realization for qty-based results analysi
What causes this issue? In Customizing in the <LS>valuation method</>, you selected quantity-based <DS:GLOS.results_analysis>result...
KJ302
Profit basis & cannot be used for planned results analysis
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.