How To Fix KJ220 - Reserves for unrealized costs cannot be apportioned to the line IDs


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KJ - Cost Object Controlling for Make-to-Order Production

  • Message number: 220

  • Message text: Reserves for unrealized costs cannot be apportioned to the line IDs

  • Show details Hide details
  • What causes this issue?

    <DS:GLOS.3526B6A7AFAB52B9E10000009B38F974>Results analysis</> or the
    <DS:GLOS.3526B772AFAB52B9E10000009B38F974>WIP calculation</> process
    calculates <GL:reserves_for_unrealized_costs>reserves for unrealized
    costs</>. However, this value cannot be apportioned to the
    <GL:line_ID>line IDs</> because the method of apportionment in the
    valuation method cannot be used for apportionment at totals level. The
    problem could be due to the values of the object being such that the
    method of apportionment cannot be applied in a logical way, or because
    the apportionment resulted in division by zero or a field overflow.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Check the object. Change the planned values if appropriate.
    Go into Customizing and check the entries in the valuation methods. If
    necessary, call up the Expert Mode and choose a different method of
    apportionment, or select the indicator <DS:DE.EINZL_POST>Other
    apportionment</>. You can only make this setting in Customizing for
    results analysis, even if you want to calculate
    <DS:GLOS.3526B774AFAB52B9E10000009B38F974>work in process</> in the
    <DS:GLOS.3526B6E8AFAB52B9E10000009B38F974>Product Cost by Order or
    Product Cost by Period</> component. If you select the <LS>Other
    apportionment</> indicator, the program automatically switches to
    method of apportionment <ZH>Z</> if the originally specified method of
    apportionment cannot be used. Method of apportionment Z means
    apportionment on the basis of the apportionment numbers specified in
    the Update. If key figures have been created, each line ID receives the
    same portion.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KJ220 - Reserves for unrealized costs cannot be apportioned to the line IDs ?
    The SAP error message KJ220, which states "Reserves for unrealized costs cannot be apportioned to the line IDs," typically occurs in the context of cost accounting and project management within SAP. This error is related to the allocation of reserves for unrealized costs in a project or internal order.
    
    Cause: Incorrect Configuration: The configuration settings for the project or internal order may not allow for the apportionment of reserves to the line items. Line Item Characteristics: The line items may not be set up correctly to receive the apportioned reserves. This could be due to missing or incorrect assignment of cost elements or categories. Cost Element Issues: The cost elements associated with the line items may not be compatible with the reserve allocation process. Project Status: The project or internal order may be in a status that does not permit the allocation of reserves. Missing Data: Required data for the calculation of reserves may be missing

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author