Do you have any question about this error?
Message type: E = Error
Message class: KG - CO-PA Planning
Message number: 060
Message text: No authorization to use this plan version
You are not authorized to use plan version &V2&.
Ask your system administrator for authorization for the authorization
object &V1&.
Error message extract from SAP system. Copyright SAP SE.
KG060
- No authorization to use this plan version ?The SAP error message KG060 ("No authorization to use this plan version") typically occurs when a user attempts to access a plan version in the SAP system for which they do not have the necessary authorizations. This is common in modules related to Controlling (CO), particularly in planning functions.
Cause:
- Missing Authorizations: The user does not have the required authorization objects assigned to their user profile to access the specific plan version.
- Plan Version Settings: The plan version may be restricted to certain user groups or roles, and the user does not belong to those groups.
- User Role Configuration: The roles assigned to the user may not include the necessary permissions for the specific plan version.
Solution:
Check User Authorizations:
- Use transaction code
SU53
immediately after encountering the error to see which authorization check failed. This will provide insight into what specific authorization is missing.- Review the user’s roles and authorizations in transaction
SU01
(User Maintenance) orPFCG
(Role Maintenance).Modify User Roles:
- If you have the necessary permissions, you can add the required authorization objects to the user’s role. The relevant authorization objects for planning might include:
C_KLAF_V
(Authorization for Plan Versions)C_KLAF_A
(Authorization for Plan Activities)- Ensure that the user has access to the specific plan version they are trying to use.
Consult with Security Team:
- If you do not have the necessary permissions to modify roles, contact your SAP security team or administrator. Provide them with the details of the error and the plan version you are trying to access.
Plan Version Configuration:
- Check the configuration of the plan version in transaction
KP04
(Change Plan Version) to ensure that it is set up correctly and that the necessary authorizations are assigned.Testing:
- After making changes to roles or authorizations, have the user log out and log back in to see if the issue is resolved.
Related Information:
By following these steps, you should be able to resolve the KG060 error and ensure that users have the necessary access to the plan versions they need.
Get instant SAP help. Start your 7-day free trial now.
KG059
No authorization to use this screen structure
What causes this issue? You are not authorized to process this screen structure.How to fix this error? Your system administrator can give you the co...
KG058
For condition analysis, choose one profitability segment only
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KG061
Screen structure & is currently being processed by &
What causes this issue? Screen structure &v1& is currently being processed by user &v2&.System Response The system issues an error m...
KG062
Profitability segment without characteristic values cannot be copied
What causes this issue? You cannot leave the characteristic value blank for this profitability segment in this planning session, because it is derive...
Click on this link to search all SAP messages.