How To Fix KAFF205 - Budget period as sender is only possible in addition to activity provider


KAFF205 - Overview

  • Message type: E = Error

  • Message class: KAFF - Overhead Cost Controlling: Integration of Fund and Function

  • Message number: 205

  • Message text: Budget period as sender is only possible in addition to activity provider

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KAFF205 - Budget period as sender is only possible in addition to activity provider ?
    The SAP error message KAFF205 indicates that there is an issue related to budget periods when working with activity allocation in SAP Controlling (CO). Specifically, this error occurs when you attempt to allocate costs to a cost center or internal order without the necessary configuration for budget periods.
    
    Cause: The error message KAFF205 typically arises due to one of the following reasons: Configuration Issue: The system is configured to require budget periods for the sender cost object (e.g., cost center or internal order), but the necessary settings are not in place. Activity Type Settings: The activity type being used may not be properly configured to allow for budget periods. Sender Object: The sender object (cost center or internal order) may not have a valid budget period defined, or the budget period is not aligned with the activity allocation being processed.
    Solution: To resolve the KAFF205 error, you can take the following steps: Check Configuration: Go to the configuration settings

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author