Message type: E = Error
Message class: K4 - Order settlement configuration tables
Message number: 012
Message text: Credit cost element for material is fixed in acct determination MM
You entered "material" as account assignment category.
The settlement cost element for material, however, is always determined
in the MM System.
Therefore, the input is not valid.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Delete your input.
Error message extract from SAP system. Copyright SAP SE.
K4012
- Credit cost element for material is fixed in acct determination MM ?The SAP error message K4012, which states "Credit cost element for material is fixed in account determination MM," typically occurs in the context of Material Management (MM) and Controlling (CO) integration. This error indicates that there is an issue with the account determination settings for the material in question, specifically regarding the credit cost element.
Cause: Account Determination Configuration: The error usually arises when the account determination for the material is not set up correctly. This can happen if the cost element for the material is fixed and does not allow for the necessary flexibility in posting. Material Master Settings: The material master record may have settings that conflict with the account determination rules, particularly in the valuation area or the costing view. Transaction Type: The transaction type being used may not be compatible with the account determination settings for the material. Missing or Incorrect Configuration: There may be missing or incorrect configuration in the
Get instant SAP help. Sign up for our Free Essentials Plan.
K4010
Cost element & not from category 22 or not available
What causes this issue? You have assigned a settlement cost element that is not type 22 (external settlement) to an account assignment category.Syste...
K4009
Define entries first
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
K4013
Specify original cost element ('OCE'), or enter a settlement cost element
What causes this issue? You must either activate the switch 'Settlement by original cost element' ('OCE') or enter a settlement c...
K4014
No possible entries are available for this field
What causes this issue? You must enter a cost element of type 22 (external settlement) for the settlement receiver.System Response The system issues...
Click on this link to search all SAP messages.