Message type: E = Error
Message class: JITOUT - Messages for JIT Outbound
Message number: 808
Message text: Cancelation of goods receipt is not possible for summarized JIT call &1
You want to cancel the goods receipt for the summarized JIT call &v1&.
Whether the reverse posting can be carried out or not depends on the
action control &V2& that is assigned to this summarized JIT call.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If you want to carry out a reverse posting, you must adjust the action
control &V2& so that the action '<LS>OCGR</>' can be carried out for
the internal status &v3& of the summarized JIT call.
You can change the action control in JIT outbound Customizing.
Error message extract from SAP system. Copyright SAP SE.
JITOUT808
- Cancelation of goods receipt is not possible for summarized JIT call &1 ?The SAP error message JITOUT808 indicates that the cancellation of a goods receipt is not possible for a summarized Just-In-Time (JIT) call. This error typically arises in scenarios where JIT processes are involved, particularly in manufacturing and supply chain management.
Cause: Summarized JIT Call: The error occurs because the goods receipt you are trying to cancel is part of a summarized JIT call. In JIT processing, multiple deliveries can be summarized into a single call, and the system does not allow the cancellation of goods receipts for these summarized calls. Status of the JIT Call: The JIT call may be in a status that does not permit cancellation. For example, if the call has already been processed or if there are subsequent processes that depend on the goods receipt. Dependencies: There may be dependencies or linked documents (like production orders or purchase orders) that prevent the cancellation of the goods receipt.
Solution: Check JIT Call Status:
Get instant SAP help. Sign up for our Free Essentials Plan.
JITOUT807
Change to delivery date is valid for the entire JIT call
What causes this issue? You want to change the delivery date of a summarized JIT call that contains several items.System Response The delivery date ...
JITOUT806
Replenishment strategy &1 does not exist in plant &3
What causes this issue? Replenishment strategy &1 that has been entered in control cycle &2 &3 &4 does not exist.System Response The...
JITOUT809
Available quantity from stock determination is too small
What causes this issue? Stock determination was carried out for material &v1& from summarized JIT call &v2& item &v3&. The av...
JITOUT810
Available quantity from batch determination is too small
What causes this issue? Batch determination was carried out for material &v1& from summarized JIT call &v2& item &V3&. The av...
Click on this link to search all SAP messages.