How To Fix /ISDFPS/MM830 - PReq &1 item &2 is still contained in material planning


/ISDFPS/MM830 - Overview

  • Message type: E = Error

  • Message class: /ISDFPS/MM -

  • Message number: 830

  • Message text: PReq &1 item &2 is still contained in material planning

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /ISDFPS/MM830 - PReq &1 item &2 is still contained in material planning ?
    The SAP error message /ISDFPS/MM830 PReq &1 item &2 is still contained in material planning typically occurs in the context of the SAP Integrated Business Planning (IBP) or Advanced Planning and Optimization (APO) modules. This error indicates that a purchase requisition (PReq) is still being referenced in material planning processes, which prevents certain actions from being completed, such as deleting or changing the requisition.
    
    Cause: Active Planning Processes: The purchase requisition is still being considered in the planning run, meaning it is part of the current planning data. Locked Data: The requisition may be locked due to ongoing planning activities or transactions that have not yet been completed. Dependencies: There may be dependencies or links to other planning objects that are preventing the requisition from being processed.
    Solution: Check Planning Runs: Ensure that all planning runs have been completed. If the requisition is still being processed, wait for the planning run to finish. Release Locks: If the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant