Message type: E = Error
Message class: IP - Messages for preventive maintenance
Message number: 712
Message text: Key date scheduling not possible with the date &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
IP712
- Key date scheduling not possible with the date & ?The SAP error message IP712 ("Key date scheduling not possible with the date &") typically occurs in the context of maintenance planning and scheduling within the SAP system, particularly when using the PM (Plant Maintenance) module. This error indicates that the system is unable to schedule a maintenance task or operation for the specified key date due to various reasons. Causes of IP712 Error Invalid Key Date: The key date specified for scheduling may fall outside the permissible range for the maintenance plan or task. This could be due to the plan's validity period or the scheduling parameters set in the system. No Maintenance Plan: The maintenance plan associated with the task may not be active or may not have been defined correctly. Scheduling Parameters: The scheduling parameters (like frequency, duration, etc.) may not be set correctly, leading to an inability to schedule the task on the specified date. Resource Availability: There may be resource
Get instant SAP help. Sign up for our Free Essentials Plan.
IP711
No package selected
What causes this issue? You have tried to enter a manual call and you have not determined the <GL:preventive_maintenance_package>maintenance pa...
IP710
No operations can be determined for plan &1 and item &2 for this date
What causes this issue? There are no operations for the calculated planned date. At least one <DS:GLOS.maintenance_task_list>task list</>...
IP713
Save or reverse the manual call first
What causes this issue? You are trying to schedule the <GL:preventive_maintenance_plan>maintenance plan</>. However, you can only carry o...
IP714
Manual call not possible as scheduling already carried out
What causes this issue? You are trying to create a manual call. This not possible at the moment, as you can only carry out <GL:maintenance_plan_sc...
Click on this link to search all SAP messages.