How To Fix IP710 - No operations can be determined for plan &1 and item &2 for this date


IP710 - Overview

  • Message type: E = Error

  • Message class: IP - Messages for preventive maintenance

  • Message number: 710

  • Message text: No operations can be determined for plan &1 and item &2 for this date

  • Show details Hide details
  • What causes this issue?

    There are no operations for the calculated planned date.
    At least one <DS:GLOS.maintenance_task_list>task list</> assigned to a
    <DS:GLOS.maintenance_item>maintenance item</> for the
    <DS:GLOS.preventive_maintenance_plan>maintenance plan</> had not yet
    been created in the system or was not valid on the calculated planned
    date or the required start date &V3& for the order.
    The start date of the <DS:GLOS.maintenance_order>order</> is therefore
    always before the planned date of the <DS:GLOS.maintenance_call>call</>
    if you work with a <DS:GLOS.preliminary_buffer>preliminary buffer</> in
    the <DS:GLOS.preventive_maintenance_package>maintenance package</> of
    the <DS:GLOS.maintenance_strategy>maintenance strategy</>.
    You cannot call the maintenance plan on this date.
    Example
    On 10.06.xx, you enter a maintenance plan, to which you assign a task
    list.
    Calculated planned date: 10.06.xx
    Due package 1: Monthly
    Preliminiary buffer for package 1: 3 days
    Using the preliminary buffer, the start date for the order is 07.06.xx.
    However, at this time the task list was not yet available in the
    system.

    System Response

    INCLUDE KEINE-FUNKTION OBJECT DOKU ID TX

    How to fix this error?

    Reschedule the maintenance plan and make sure that the planned date is
    not before the validity date for your task lists.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message IP710 - No operations can be determined for plan &1 and item &2 for this date ?
    The SAP error message IP710 ("No operations can be determined for plan &1 and item &2 for this date") typically occurs in the context of production planning and scheduling, particularly when working with maintenance plans or production orders. This error indicates that the system is unable to find any operations associated with the specified maintenance plan or item for the given date.
    Causes:
    
    No Operations Defined: The maintenance plan or production order does not have any operations defined for the specified date.
    Date Mismatch: The date you are trying to access may not fall within the valid range of the operations defined in the plan.
    Incorrect Plan or Item: The maintenance plan or item number specified may be incorrect or does not exist in the system.
    Status Issues: The maintenance plan or item may be in a status that prevents operations from being determined (e.g., inactive or not released).
    
    Configuration Issues: There may be configuration issues

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker