Do you have any question about this error?
Message type: E = Error
Message class: HRPSGB - HR PS Great Britain
Message number: 089
Message text: No authorisation for project &1, WBS element &2
Access denied for project &v1&
The WBS element &v2& belonging to project &v1& is excluded from the
drilldown reporting list.
To view the posted personnel costs for a WBS element it is necessary
to have to the drilldown authorisation for the corresponding project.
Verify, if your entries are correct.
Check, if the user's authorisation profile contains the object
'P_DRL_COST', or if the 'cost object default check' has been switched
on (table T77S0).
Error message extract from SAP system. Copyright SAP SE.
HRPSGB089
- No authorisation for project &1, WBS element &2 ?The SAP error message HRPSGB089 indicates that a user does not have the necessary authorization to access a specific project and WBS (Work Breakdown Structure) element. This error typically arises in the context of project management and human resources modules within SAP.
Cause:
- Authorization Issues: The user attempting to access the project or WBS element does not have the required authorizations assigned in their user profile.
- Missing Roles: The user may not have been assigned the appropriate roles that include access to the project and WBS element.
- Project Status: The project or WBS element may be in a status that restricts access to certain users.
- Organizational Structure: The user may not be part of the organizational unit that has access to the project or WBS element.
Solution:
Check User Authorizations:
- Use transaction code
SU53
immediately after encountering the error to check the authorization check that failed. This will provide insights into which specific authorization is missing.- Review the user’s roles and profiles in transaction
SU01
orPFCG
to ensure they have the necessary permissions.Assign Missing Roles:
- If the user lacks the required roles, work with your SAP security team to assign the appropriate roles that include access to the project and WBS element.
Review Project and WBS Element Settings:
- Check the status of the project and WBS element to ensure they are not restricted. You can do this using transaction codes like
CJ20N
(Project Builder) orCJ03
(Display WBS Element).Organizational Assignment:
- Ensure that the user is assigned to the correct organizational units that have access to the project. This may involve checking the user’s organizational assignments in their user profile.
Consult with SAP Security Team:
- If you are unable to resolve the issue, consult with your SAP security team or administrator for further assistance. They can analyze the authorization objects and make necessary adjustments.
Related Information:
C_PROJ
(Project Management) and C_PERSNL
(Personnel Management). Ensure that the user has the necessary authorizations for these objects.SU53
: Display Authorization CheckSU01
: User MaintenancePFCG
: Role MaintenanceCJ20N
: Project BuilderCJ03
: Display WBS ElementBy following these steps, you should be able to identify and resolve the authorization issue related to the HRPSGB089 error message in SAP.
Get instant SAP help. Start your 7-day free trial now.
HRPSGB088
No authorisation for internal order &1, order type &2
What causes this issue? Access denied for internal order &v1&System Response The internal order &v1& is excluded from the drilldown ...
HRPSGB087
No authorisation for costcenter &1
What causes this issue? Access denied for cost center &v1&System Response The cost center &v1& is excluded from the drilldown report...
HRPSGB090
Memory export or import failed
What causes this issue? The export to / import from memory statement ended with error.System Response The internal table, containing the error log h...
HRPSGB091
Cost center &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...