Do you have any question about this error?
Message type: E = Error
Message class: HRPSGB - HR PS Great Britain
Message number: 087
Message text: No authorisation for costcenter &1
Access denied for cost center &v1&
The cost center &v1& is excluded from the drilldown reporting list. To
view the posted personnel costs for a cost center it is necessary to
have to the drilldown authorisation for this object.
Verify, if your entries are correct.
Check, if the user's authorisation profile contains the object
'P_DRL_COST', or if the 'cost object default check' has been switched
on (table T77S0).
Error message extract from SAP system. Copyright SAP SE.
HRPSGB087
- No authorisation for costcenter &1 ?The SAP error message HRPSGB087, which states "No authorization for cost center &1," typically occurs when a user attempts to access or perform an action related to a specific cost center for which they do not have the necessary authorization. This is a common issue in SAP systems, particularly in modules related to Human Resources (HR) and Controlling (CO).
Cause:
- Authorization Issues: The user does not have the required authorization to access or modify the specified cost center. This could be due to missing roles or authorizations in their user profile.
- Cost Center Configuration: The cost center may not be properly configured in the system, or it may be inactive.
- User Role Assignment: The user may not be assigned to the appropriate organizational units or roles that grant access to the cost center.
Solution:
Check User Authorizations:
- Use transaction code
SU53
immediately after encountering the error to check the authorization check that failed. This will provide insight into which specific authorization object is missing.- Review the user's roles and authorizations in transaction code
SU01
(User Maintenance) orPFCG
(Role Maintenance) to ensure they have the necessary permissions for the cost center.Modify User Roles:
- If the user lacks the necessary authorizations, you may need to assign additional roles or modify existing ones to include access to the relevant cost center.
- Ensure that the roles assigned to the user include the necessary authorization objects related to cost center access (e.g.,
C_KOSTL
for cost center authorization).Cost Center Status:
- Verify the status of the cost center in transaction code
KS03
(Display Cost Center). Ensure that the cost center is active and correctly configured.Consult with Security Team:
- If you do not have the necessary permissions to modify user roles or if you are unsure about the required authorizations, consult with your SAP security team or administrator for assistance.
Testing:
- After making changes to the user’s authorizations or roles, have the user log out and log back in to test if the issue is resolved.
Related Information:
C_KOSTL
(Cost Center) and C_TCODE
(Transaction Code) that govern access to cost centers.SU53
: Display Authorization CheckSU01
: User MaintenancePFCG
: Role MaintenanceKS03
: Display Cost CenterBy following these steps, you should be able to identify and resolve the authorization issue related to the cost center in SAP.
Get instant SAP help. Start your 7-day free trial now.
HRPSGB086
No WBS elements were selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
HRPSGB085
Project &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
HRPSGB088
No authorisation for internal order &1, order type &2
What causes this issue? Access denied for internal order &v1&System Response The internal order &v1& is excluded from the drilldown ...
HRPSGB089
No authorisation for project &1, WBS element &2
What causes this issue? Access denied for project &v1&System Response The WBS element &v2& belonging to project &v1& is exc...
Click on this link to search all SAP messages.