How To Fix HRHAP00_PMP_PROCESS020 - The due date is outside of the process validity period


HRHAP00_PMP_PROCESS020 - Overview

  • Message type: E = Error

  • Message class: HRHAP00_PMP_PROCESS - Message Class for Performance Management Process

  • Message number: 020

  • Message text: The due date is outside of the process validity period

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message HRHAP00_PMP_PROCESS020 - The due date is outside of the process validity period ?
    The SAP error message HRHAP00_PMP_PROCESS020 indicates that the due date for a specific process is outside the defined validity period for that process. This typically occurs in the context of performance management or talent management processes within SAP SuccessFactors or SAP HCM (Human Capital Management).
    
    Cause: Invalid Due Date: The due date set for the performance management process is either before the start date or after the end date of the process validity period.
    Configuration Issues: The process validity period may not be correctly configured in the system, leading to discrepancies between the due date and the defined period. Data Entry Errors: Manual entry of dates may have led to incorrect due dates being assigned to the process.
    Solution: Check Process Validity Period: Navigate to the configuration settings for the performance management process. Verify the start and end dates of the process validity period. Ensure that the due date falls within this range. Adjust Due Date: If the due date is

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker