Message type: E = Error
Message class: GP - FI-SL and CO planning
Message number: 859
Message text: Conversion of the leading currencies may lead to problems (->long text)
The standard setting for copying costs or prices is the transaction
currency or controlling area currency. Note that converting the leading
currency can lead to unrequired effects, for example:
You are copying costs with the controlling area currency as leading
currency, although all currencies are active on the database (see
transaction <DS:TRAN.OKKP>Settings in controlling area</>). If data
exists, whose keys are only differentiated by the transaction currency,
the difference is ignored and both records are summarized in a new
record. It is essential that a planning in transaction currency is also
copied with the transaction currency as leading currency.
You are copying costs with the object currency as leading currency. You
should check that all objects in the target version use the same object
currency as the corresponding object in the source version.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
You can change the settings for this message in Customizing by
choosing: Controlling -> General Controlling ->
<DS:SIMG.SIMG_CFMENUORK3OBA5>Change Message Control</>. Enter the
following settings:
Enter "GP" as the application area.
For message 859, enter the desired message type for online processing.
To do this, use the following code:
Message type,,ID
Error message,,E
Note in window,,I
Warning,,W
No message,,-
Error message extract from SAP system. Copyright SAP SE.
GP859
- Conversion of the leading currencies may lead to problems (->long text) ?The SAP error message GP859 indicates that there may be issues related to the conversion of leading currencies in the system. This error typically arises in the context of financial transactions, particularly when dealing with multiple currencies in SAP's General Ledger or during the processing of financial documents.
Cause: Currency
Configuration Issues: The leading currency may not be properly configured in the system, or there may be inconsistencies in the currency settings across different company codes or controlling areas. Exchange Rate Issues: The exchange rates for the currencies involved may not be maintained correctly, leading to potential discrepancies during conversion. Transaction Data Issues: There may be specific transactions that are not compatible with the leading currency settings, or there may be missing data that is required for the conversion process. Custom Code or Enhancements: If there are custom developments or enhancements in the system, they may not handle currency conversions correctly.
Solution: Check Currency Configuration: Verify the
Get instant SAP help. Sign up for our Free Essentials Plan.
GP858
Maximum allowable posting period exceeded (see long text)
What causes this issue? You transferred version parameter &V2& to function module &V1&. The latest posting period you transferred is ...
GP857
Resources already exist in the plan version (see long text)
What causes this issue? You selected the option "Reset and overwrite" when copying actual values from fiscal year &V1& to plan vers...
GP860
Version &2 is not a plan version in controlling area &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GP861
Plan data of version &2/&3 cannot be copied (see long text)
What causes this issue? You cannot copy planning data from version &V2&, fiscal year &V3& in controlling area &V1&.System Res...
Click on this link to search all SAP messages.