Message type: E = Error
Message class: GP - FI-SL and CO planning
Message number: 125
Message text: The planning data is blocked for changes
You are trying to process a combination of ledger &V1&, version &V2&,
company code or global company &V3& and fiscal year &V4& which is
blocked for planning.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
You maintain the lock indicator in the fiscal year-dependent version
parameters in table T895 for company codes and in table T895C (via the
FI-SL settin menu) for global companies.
Error message extract from SAP system. Copyright SAP SE.
GP125
- The planning data is blocked for changes ?The SAP error message GP125, which states "The planning data is blocked for changes," typically occurs in the context of SAP's planning and budgeting modules, such as SAP Integrated Business Planning (IBP) or SAP Business Planning and Consolidation (BPC). This error indicates that the planning data you are trying to modify is currently locked or blocked from being changed. Here are some common causes, solutions, and related information for this error:
Causes:
- Data Locking: The planning data may be locked by another user or process. This can happen if another user is currently editing the same data or if a batch job is running that locks the data for processing.
- Planning Cycle Status: The planning cycle may be in a status that does not allow changes, such as "Completed" or "Locked."
- Authorization Issues: The user may not have the necessary authorizations to make changes to the planning data.
- Data Integrity Checks: The system may have integrity checks that prevent changes to certain data under specific conditions.
- Configuration Settings: Certain configuration settings in the planning application may restrict changes to the data.
Solutions:
- Check for Locks: Verify if another user is currently editing the data. You can use transaction codes like SM12 (for lock entries) to see if there are any active locks on the data.
- Review Planning Cycle Status: Check the status of the planning cycle. If it is locked or completed, you may need to unlock it or create a new planning cycle to make changes.
- User Authorizations: Ensure that the user has the appropriate authorizations to modify the planning data. This may involve checking roles and permissions in the user profile.
- Consult with Administrators: If you are unsure about the configuration settings or the status of the planning cycle, consult with your SAP system administrator or the person responsible for managing the planning application.
- Wait for Batch Jobs: If a batch job is running, you may need to wait until it completes before making changes to the planning data.
Related Information:
If the problem persists after trying the above solutions, it may be necessary to escalate the issue to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
GP124
Quantities stored in the ledger must be planned manually
What causes this issue? Your ledger stores quantity field groups which are not planned manually. The quantity field groups cannot be filled in becaus...
GP123
Plan manually at least one currency stored in the ledger
What causes this issue? Your ledger stores at least one currency field group, but none are planned manually. The currency field groups cannot be fil...
GP126
The distribution key has been set to manual
What causes this issue? The distribution key is always set to manual distribution (0) if a redistribution with the last distribution key would change...
GP127
Scaling factor & can only be used with at least & decimals
What causes this issue? Counter field overflow occurs if the scaling factors are too large.System Response The system issues an error message and wi...
Click on this link to search all SAP messages.