How To Fix GM068 - Assessment cost element & is not supported in secondary cost planning


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GM - Combination manager

  • Message number: 068

  • Message text: Assessment cost element & is not supported in secondary cost planning

  • Show details Hide details
  • What causes this issue?

    Cost element &V1& is an assessment cost element. Assessment cost
    elements are special allocation cost elements that are used exclusively
    for the planned or actual allocation of the assessment. During manual
    planning, such cost elements cannot be provided with values.

    System Response

    Cost element &V1& is not taken into account.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GM068 - Assessment cost element & is not supported in secondary cost planning ?

    The SAP error message GM068 indicates that an assessment cost element is not supported in secondary cost planning. This typically occurs in the context of controlling (CO) when you are trying to perform a secondary cost allocation using an assessment cost element, which is not allowed in certain scenarios.

    Cause:

    1. Assessment Cost Element: Assessment cost elements are used to allocate costs from one cost center or internal order to another. However, they are not designed to be used in secondary cost planning.
    2. Configuration Issues: The system may be configured in a way that does not allow the use of assessment cost elements in the context you are trying to use them.
    3. Incorrect Planning Version: You might be using a planning version that does not support the use of assessment cost elements.

    Solution:

    1. Use Primary Cost Elements: If you are trying to allocate costs in a secondary cost planning scenario, consider using primary cost elements instead of assessment cost elements.
    2. Check Configuration: Review the configuration settings in the controlling area to ensure that the cost elements are set up correctly. You may need to consult with your SAP CO configuration team.
    3. Planning Version: Ensure that you are using the correct planning version that allows for the type of cost allocation you are attempting. You may need to create or modify a planning version to support your requirements.
    4. Use Distribution Instead: If you need to allocate costs, consider using distribution instead of assessment if it fits your business process.

    Related Information:

    • SAP Documentation: Refer to the SAP Help Portal for detailed documentation on cost element accounting and planning in SAP CO.
    • Transaction Codes: Familiarize yourself with relevant transaction codes such as KP06 (Cost Center Planning) and KP26 (Activity Type Planning) to manage your planning scenarios effectively.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues or provide updates related to this error message.

    If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP CO for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author