How To Fix GJ926 - PO & &: Cost Element & Is Secondary.


GJ926 - Overview

  • Message type: E = Error

  • Message class: GJ - Joint Venture Accounting

  • Message number: 926

  • Message text: PO & &: Cost Element & Is Secondary.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GJ926 - PO & &: Cost Element & Is Secondary. ?
    The SAP error message GJ926 indicates that there is an issue with the cost element being used in a Purchase Order (PO) or related transaction. Specifically, the message states that the cost element in question is a secondary cost element, which cannot be used in certain contexts, such as in a Purchase Order.
    
    Cause: Secondary Cost Element: In SAP, cost elements are categorized as primary or secondary. Primary cost elements are used to record costs directly from financial accounting, while secondary cost elements are used for internal cost allocation and are not meant to be used in external transactions like POs. Incorrect Configuration: The cost element may have been incorrectly configured in the system, leading to its classification as a secondary cost element when it should be a primary one. Transaction Type: The transaction type being processed may not support secondary cost elements, leading to this error.
    Solution: Check Cost Element Configuration: Go to the transaction code

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author