Message type: E = Error
Message class: GA - Allocations
Message number: 790
Message text: No summarization level exists for cycle &
The tracing factors for cycle &V1& cannot be read from a summarization
level.
This message is displayed when executing a periodic allocation of
overhead costs (assessment, indirect activity allocation) if portions
are used as tracing factors in at least one segment. It is designed to
make you aware of potential improvement in performance which is not
being used.
If variable portions are used as tracing factors, the distribution
factors are determined from the object level (table CE3xxxx/CE4xxxx,
xxxx=operating concern). If there is a large amount of data at object
level, selection can take a long time. The summarization levels can be
used to pre-summarize the transaction data, resulting in a drastic
reduction in runtimes for periodic allocations.
The tracing factor is determined from the object level. This does not
alter the result of periodic allocation, but the runtime can be
lengthy.
For large data volumes, define a summarization level in the object
level in order to improve performance.
For more information, see the program documentation and the customizing
functions, which include a form for defining an appropriate
summarization level for periodic allocation.
Error message extract from SAP system. Copyright SAP SE.
GA790
- No summarization level exists for cycle & ?The SAP error message GA790 "No summarization level exists for cycle &" typically occurs in the context of the SAP Controlling (CO) module, particularly when dealing with internal orders, cost centers, or profit centers. This error indicates that the system cannot find a summarization level for the specified cycle in the planning or actual data.
Cause: Missing Summarization Level: The most common cause is that the summarization level for the specified cycle has not been defined in the system. This can happen if the configuration for the planning cycle is incomplete or if the cycle has been deleted or not properly set up. Incorrect Cycle Configuration: The cycle may not be correctly configured in the system, leading to the absence of a summarization level. Data Consistency Issues: There may be inconsistencies in the data or configuration that prevent the system from recognizing the summarization level.
Solution: Check Configuration: Go to the configuration settings for the relevant cycle
Get instant SAP help. Sign up for our Free Essentials Plan.
GA789
Variable costs are not transferred
What causes this issue? The senders for cycle &V1& contain variable costs. However, these have not been assigned to a value field of the oper...
GA788
Fixed costs are not transferred
What causes this issue? The senders for cycle &V1& contain fixed costs. However, these have not been assigned to a value field of the operati...
GA791
Reference data read from summarization level &1
What causes this issue? Tracing factors for cycle &V2& were read from summarization level &V1&. This message is displayed when carryi...
GA792
Transfer of cost center costs is temporarily locked due to conversions.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...