Do you have any question about this error?
Message type: E = Error
Message class: GA - Allocations
Message number: 149
Message text: Cycle check with &1 completed: For details see error log
During validation for the cycle definition &V1& occurred.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Analyze the error log with the menu path "Extras -> Error log" and, if
required, correct the cycle definition.
Error message extract from SAP system. Copyright SAP SE.
GA149
- Cycle check with &1 completed: For details see error log ?The SAP error message GA149 indicates a cycle check issue in the context of a production order or a similar process. This error typically arises when there is a circular dependency in the production process, which can occur in various scenarios, such as when trying to create or process production orders, bills of materials (BOMs), or routing.
Cause:
- Circular Dependency: The most common cause of this error is a circular dependency in the BOM or routing. For example, if a component in a BOM references the parent material, it creates a cycle.
- Incorrect Configuration: Misconfiguration in the production process, such as incorrect settings in the material master or routing, can lead to this error.
- Data Integrity Issues: Inconsistent or corrupt data in the system can also trigger this error.
Solution:
- Check the Error Log: The error message suggests checking the error log for more details. This log will provide specific information about which materials or components are causing the cycle check.
- Review BOM and Routing: Examine the BOM and routing for the materials involved. Look for any references that might create a circular dependency. Ensure that no component is referencing the parent material.
- Adjust Configuration: If the configuration settings are incorrect, adjust them to eliminate the circular dependency.
- Data Cleanup: If there are data integrity issues, consider running data consistency checks or cleaning up the data in the relevant tables.
- Consult Documentation: Refer to SAP documentation or notes related to the specific error message for additional guidance and troubleshooting steps.
Related Information:
CS03
(Display BOM), CA03
(Display Routing), or CO03
(Display Production Order) to investigate the relevant data.By following these steps, you should be able to identify and resolve the cause of the GA149 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
GA148
Formal cycle check was successful.
What causes this issue? The formal check of the cycle was successful.How to fix this error? Note that the system did not make a complete master data...
GA147
Operating concern & is not assigned to a controlling area.
What causes this issue? For transfer of cost center costs to Profitability Analysis, the profitability segment must be assigned to the controlling ar...
GA150
Plan allocation for order & in version & not allowed.
What causes this issue? Order &V1& is used as a sender or receiver in the plan allocation used with version &V2&. This order, however...
GA151
Plan allocation for WBS element & in version & not allowed.
What causes this issue? WBS element &V1& is used as a sender or receiver in the plan allocation used with version &V2&. This WBS elem...
Click on this link to search all SAP messages.