Do you have any question about this error?
Message type: E = Error
Message class: GA - Allocations
Message number: 148
Message text: Formal cycle check was successful.
The formal check of the cycle was successful.
Note that the system did not make a complete master data check, because
this would require too much runtime.
The system checked for the existence and validity of master data, the
completeness of tracing factors for the segment definition, 100%
balancing of the sender, and the equivalency of fixed sender and
receiver values.
Error message extract from SAP system. Copyright SAP SE.
GA148
- Formal cycle check was successful. ?The SAP error message GA148, which states "Formal cycle check was successful," typically occurs in the context of the SAP system's handling of master data, particularly in the area of General Ledger (G/L) accounting or when dealing with cost centers, internal orders, or other financial objects. This message indicates that the system has detected a potential cycle in the relationships between various financial objects, which could lead to circular references.
Cause:
- Circular References: The most common cause of this error is the presence of circular references in the configuration of financial objects. For example, if a cost center is assigned to another cost center in a way that creates a loop, the system will flag this as a potential issue.
- Incorrect Configuration: Misconfigurations in the master data setup, such as incorrect assignment of cost elements, cost centers, or internal orders, can lead to this error.
- Data Integrity Issues: Inconsistent or corrupt data in the master records can also trigger this error.
Solution:
- Review Master Data: Check the configuration of the financial objects involved. Look for any circular references in the assignments of cost centers, internal orders, or other related objects.
- Correct Assignments: If you identify any circular references, correct the assignments to eliminate the cycle. Ensure that each object points to a valid and non-circular reference.
- Use Transaction Codes: Utilize relevant transaction codes (like KSB1 for cost center reports or KOB1 for internal orders) to analyze the relationships and dependencies between the financial objects.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on configuring financial objects to avoid circular references.
- Testing: After making changes, perform tests to ensure that the error does not reoccur and that the financial reporting functions as expected.
Related Information:
By following these steps, you should be able to identify and resolve the underlying issues causing the GA148 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
GA147
Operating concern & is not assigned to a controlling area.
What causes this issue? For transfer of cost center costs to Profitability Analysis, the profitability segment must be assigned to the controlling ar...
GA146
Time interval & to & contains no periods.
What causes this issue? The time interval between start date &V1& and end date &V2& do not include a complete period.System Response ...
GA149
Cycle check with &1 completed: For details see error log
What causes this issue? During validation for the cycle definition &V1& occurred.System Response The system issues an error message and will...
GA150
Plan allocation for order & in version & not allowed.
What causes this issue? Order &V1& is used as a sender or receiver in the plan allocation used with version &V2&. This order, however...
Click on this link to search all SAP messages.