Message type: E = Error
Message class: GA - Allocations
Message number: 146
Message text: Time interval & to & contains no periods.
The time interval between start date &V1& and end date &V2& do not
include a complete period.
You cannot use the cycle with the selected interval. Neither
maintenance of fixed sender values or receiver bases, nor execution of
the cycle are possible.
Please change the cycle end date so that at least one period is covered
by the time interval start date/end date.
Error message extract from SAP system. Copyright SAP SE.
GA146
- Time interval & to & contains no periods. ?The SAP error message GA146 "Time interval & to & contains no periods" typically occurs in the context of Asset Accounting (FI-AA) when you are trying to execute a report or transaction that requires a specific time interval, but the system cannot find any valid periods within that interval.
Cause: No Valid Posting Periods: The specified time interval does not contain any valid posting periods. This can happen if the periods have been closed or if the fiscal year variant does not allow postings in the specified range. Incorrect Date Range: The date range you are trying to use may be incorrect or not aligned with the fiscal year settings.
Configuration Issues: There may be configuration issues in the fiscal year variant or the posting periods that prevent the system from recognizing the periods.
Solution: Check Posting Periods: Go to the transaction code OB52 (Maintain Posting Periods) and check if the periods for the specified fiscal year
Get instant SAP help. Sign up for our Free Essentials Plan.
GA145
No segment found in interval &1 to &2 for cycle &3, start date &4
What causes this issue? Cycle &V3& with start date &V4& does not contain any segments in intervals &V1& to &V2&.How t...
GA144
Variants & not created for & .
What causes this issue? Variant &V1& was created for allocation &V3&, but is now to be used for allocation &V2& .System Respo...
GA147
Operating concern & is not assigned to a controlling area.
What causes this issue? For transfer of cost center costs to Profitability Analysis, the profitability segment must be assigned to the controlling ar...
GA148
Formal cycle check was successful.
What causes this issue? The formal check of the cycle was successful.How to fix this error? Note that the system did not make a complete master data...
Click on this link to search all SAP messages.