Message type: E = Error
Message class: GA - Allocations
Message number: 150
Message text: Plan allocation for order & in version & not allowed.
Order &V1& is used as a sender or receiver in the plan allocation used
with version &V2&. This order, however, is not a valid sender/receiver
because it is not integrated with planning.
An order is plan integrated if the corresponding indicator is activated
in the order's master data (current setting: "&V3&" ) and the indicator
"Plan integration with Cost Center Accounting" is set in the version
(current setting "&V4&" ).
Order &V1& is not a valid sender/receiver. Plan allocation continues.
If the order is to be used in plan allocation, the indicators named
above must be activated. See the current settings above to determine
which of these indicators needs to be set.
Error message extract from SAP system. Copyright SAP SE.
GA150
- Plan allocation for order & in version & not allowed. ?The SAP error message GA150, which states "Plan allocation for order & in version & not allowed," typically occurs in the context of production planning and controlling (PP/PC) when there is an issue with the allocation of planned orders or production orders in a specific version of the planning data.
Cause: Version Control: The error often arises when the system is trying to allocate a planned order to a version that is not allowed for that particular order type or scenario. This can happen if the version is not active or if it has been set up incorrectly in the configuration. Order Type Restrictions: Certain order types may have restrictions on which planning versions can be used. If the order type does not allow the specified version, this error will occur.
Configuration Issues: There may be configuration settings in the planning area or version management that restrict the use of certain versions for specific
Get instant SAP help. Sign up for our Free Essentials Plan.
GA149
Cycle check with &1 completed: For details see error log
What causes this issue? During validation for the cycle definition &V1& occurred.System Response The system issues an error message and will...
GA148
Formal cycle check was successful.
What causes this issue? The formal check of the cycle was successful.How to fix this error? Note that the system did not make a complete master data...
GA151
Plan allocation for WBS element & in version & not allowed.
What causes this issue? WBS element &V1& is used as a sender or receiver in the plan allocation used with version &V2&. This WBS elem...
GA152
Enter the cycle name and its start date.
What causes this issue? Befor you enter segments or make selections using F4 (input help), you must enter the cycle and its start date.Error message ...
Click on this link to search all SAP messages.