Do you have any question about this error?
Message type: E = Error
Message class: FMAVC - Message class AVC funds management
Message number: 226
Message text: Control ledger &1 cannot be re-initialized (see long text)
The list of budget periods that you have selected for reconstructing the
<DS:DE.BUAVC_ALDNR>availability control ledger</> &V1& for FM area &V2&
and fiscal year &V3& is not consistent: the reconstruction process
involves at least one control object assigned to a budget period (&V4&
), which is not included in the list of selected budget periods.
In a single run, the reconstruction process can only consider the
posting addresses, budget addresses and derived control objects which
are assigned to the <ZH>same list of budget periods</>.
Processing stops.
Add at least the missing budget period &V4& to your selection and start
the process again. If you receive a similar message repeatedly for other
budget period values, SAP recommends that you run the process for all
budget periods.
Please verify the derivation strategies you have used for assigning
budget addresses and control objects in the Customizing of the BCS
budget structure and BCS availability control. If possible, choose the
same budget period value for a given posting address, the assigned
budget address (BCS budget structure) and the assigned control object
(BCS availability control).
Error message extract from SAP system. Copyright SAP SE.
FMAVC226
- Control ledger &1 cannot be re-initialized (see long text) ?The SAP error message FMAVC226 indicates that the control ledger specified cannot be re-initialized. This error typically arises in the context of the SAP Funds Management module, particularly when dealing with budget control and availability control ledgers.
Cause:
The error can occur due to several reasons, including:
- Existing Data: The control ledger already contains data that prevents re-initialization. This could be due to posted documents or transactions that reference the control ledger.
- Configuration Issues: There may be configuration settings that are not aligned with the requirements for re-initialization.
- Authorization Issues: The user may not have the necessary authorizations to perform the re-initialization.
- System Status: The system may be in a status that does not allow for re-initialization, such as being in a closed fiscal year or period.
Solution:
To resolve the FMAVC226 error, you can take the following steps:
Check for Existing Data: Review the control ledger for any existing postings or transactions. If there are any, you may need to reverse or delete them before attempting to re-initialize.
Review Configuration: Ensure that the configuration settings for the control ledger are correct. This includes checking the settings in the Funds Management module and ensuring that the ledger is set up properly.
User Authorizations: Verify that the user attempting the re-initialization has the necessary authorizations. You may need to consult with your SAP security team to ensure that the user has the appropriate roles and permissions.
System Status: Check the status of the fiscal year and periods. If the fiscal year is closed, you may need to open it or perform the re-initialization in an open period.
Consult Documentation: Refer to the long text of the error message for additional details and guidance specific to your SAP system version.
SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address this specific error message or provide additional troubleshooting steps.
Contact SAP Support: If the issue persists after trying the above steps, consider reaching out to SAP Support for further assistance.
Related Information:
By following these steps, you should be able to identify the cause of the FMAVC226 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
FMAVC225
Control ledger &1 cannot be re-initialized (see long text)
What causes this issue? You have selected a list of budget periods for reconstructing the <DS:DE.BUAVC_ALDNR>availability control ledger</&g...
FMAVC224
Control ledger &1 cannot be re-initialized (see long text)
What causes this issue? The list of funded programs that you have selected for reconstructing the <DS:DE.BUAVC_ALDNR>availability control ledge...
FMAVC227
Control ledger &1 cannot be re-initialized (see long text)
What causes this issue? The list of budget periods that you have selected for reconstructing the <DS:DE.BUAVC_ALDNR>availability control ledger...
FMAVC228
Control ledger &1 cannot be re-initialized (see long text)
What causes this issue? The list of budget periods that you have selected for reconstructing the <DS:DE.BUAVC_ALDNR>availability control ledger...
Click on this link to search all SAP messages.