Do you have any question about this error?
Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 695
Message text: Component & with rqmts date & and rqmts quantity & not available
Although there is remaining available capacity at the calculated point
in time &V2& but not the material components required.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
You should dispatch at a later time or adjust your material requirements
planning.
Error message extract from SAP system. Copyright SAP SE.
CY695
- Component & with rqmts date & and rqmts quantity & not available ?The SAP error message CY695 indicates that a specific component is not available for the given requirements date and quantity. This error typically arises in the context of production planning and materials management when the system cannot find sufficient stock or planned receipts to meet the demand for a component in a production order or a bill of materials (BOM).
Cause:
- Insufficient Stock: The most common cause is that there is not enough stock of the component available in inventory to fulfill the requirements.
- Lead Time Issues: The lead time for procurement or production of the component may not align with the requirements date, leading to unavailability.
- Incorrect Planning: The planning parameters (like safety stock, reorder points, etc.) may not be set correctly, resulting in inadequate stock levels.
- Demand Changes: Changes in demand or unexpected orders may have depleted the available stock.
- Incorrect BOM or Routing: There may be errors in the BOM or routing that lead to incorrect component requirements being calculated.
Solution:
- Check Stock Levels: Verify the current stock levels of the component in question. Use transaction codes like
MMBE
to check stock availability.- Adjust Requirements: If possible, adjust the requirements date or quantity to align with available stock or planned receipts.
- Procurement: If stock is insufficient, consider placing a purchase order or production order to procure the necessary components.
- Review Planning Parameters: Check and adjust planning parameters in the material master (like safety stock levels, reorder points, etc.) to ensure they are set appropriately.
- Analyze Demand: Review the demand history and forecast to ensure that the planning is aligned with actual needs.
- Check BOM and Routing: Ensure that the BOM and routing are correct and that they reflect the actual production process.
Related Information:
MD04
(Stock/Requirements List), MD02
(MDM Planning), and CO01
(Create Production Order) to analyze and manage production orders and stock levels.By following these steps, you should be able to identify the root cause of the CY695 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CY694
No components exist
What causes this issue? According to the strategy profile you intend to carry out a material availability check. However, no material components are ...
CY693
Unit of measure & not found
What causes this issue? The scale &V1& is not defined in Customizing.System Response The system cannot generate the planning table.How to fi...
CY696
Dispatching sequence for strategy profile & not maintained
What causes this issue? No key for determining the dispatching sequence is set in the strategy profile & in Customizing for capacity leveling.How...
CY697
Assignment of requirements grouping & to a chart is not possible
What causes this issue? The assignment of the requirements grouping &V1& to a chart cannot be carried out.System Response The callup of the ...
Click on this link to search all SAP messages.