Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 697
Message text: Assignment of requirements grouping & to a chart is not possible
The assignment of the requirements grouping &V1& to a chart cannot be
carried out.
The callup of the planning table is terminated.
Assign to the charts in the layout of the capacity planning table a
grouping that is valid for your call.
Error message extract from SAP system. Copyright SAP SE.
CY697
- Assignment of requirements grouping & to a chart is not possible ?The SAP error message CY697, which states "Assignment of requirements grouping & to a chart is not possible," typically occurs in the context of SAP's Capacity Planning and Production Planning modules. This error indicates that there is an issue with the assignment of a requirements grouping to a specific chart of accounts or capacity planning chart.
Causes:
- Inconsistent Configuration: The requirements grouping may not be properly configured or may not exist in the system.
- Missing Master Data: The necessary master data (like work centers, production resources, or other related entities) may be missing or incorrectly set up.
- Incorrect Chart Assignment: The requirements grouping may not be compatible with the chart of accounts or the specific chart being used in the planning process.
- Authorization Issues: The user may not have the necessary authorizations to make changes or view the required data.
Solutions:
Check Configuration:
- Go to the configuration settings for requirements grouping and ensure that it is correctly defined and assigned to the appropriate charts.
- Use transaction codes like
SPRO
to access the configuration settings.Verify Master Data:
- Ensure that all relevant master data (work centers, production resources, etc.) is correctly set up and linked to the requirements grouping.
- Check for any missing or incorrect entries in the master data.
Review Chart Assignments:
- Confirm that the requirements grouping is compatible with the chart of accounts or the specific chart being used.
- If necessary, reassign the requirements grouping to a different chart that is compatible.
Check Authorizations:
- Ensure that the user has the necessary authorizations to access and modify the relevant data.
- Consult with your SAP security team if there are any authorization issues.
Consult Documentation:
- Review SAP documentation or help resources for any specific notes or guidelines related to this error message.
SAP Notes:
- Check the SAP Support Portal for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
Related Information:
C223
(for requirements grouping) and CPI1
(for capacity planning).If the issue persists after following these steps, it may be beneficial to consult with an SAP expert or your organization's SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CY696
Dispatching sequence for strategy profile & not maintained
What causes this issue? No key for determining the dispatching sequence is set in the strategy profile & in Customizing for capacity leveling.How...
CY695
Component & with rqmts date & and rqmts quantity & not available
What causes this issue? Although there is remaining available capacity at the calculated point in time &V2& but not the material components r...
CY698
& & & &
What causes this issue? Error/problem in accessing planning table, which is of a temporary nature. This means that it has not yet been established on...
CY699
& & & &
What causes this issue? This message is of a temporary character or is internal to a program. It describes a temporary problem (to be removed before ...
Click on this link to search all SAP messages.