Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 696
Message text: Dispatching sequence for strategy profile & not maintained
No key for determining the dispatching sequence is set in the strategy
profile & in Customizing for capacity leveling.
You should enter a key for defining the dispatching sequence.
INCLUDE NA_SYSAD3
Error message extract from SAP system. Copyright SAP SE.
CY696
- Dispatching sequence for strategy profile & not maintained ?The SAP error message CY696 indicates that there is an issue with the dispatching sequence for a strategy profile in the context of production planning and control, particularly in the area of capacity planning and scheduling. This error typically arises when the system is unable to find a valid dispatching sequence for the specified strategy profile.
Cause: The error can occur due to several reasons: Missing Dispatching Sequence: The dispatching sequence for the specified strategy profile has not been maintained in the system. Incorrect Configuration: The configuration settings for the strategy profile may be incomplete or incorrect. Profile Not Assigned: The strategy profile may not be properly assigned to the relevant production resources or planning scenarios.
Solution: To resolve the error, you can follow these steps: Check Strategy Profile Configuration: Go to the configuration settings for the strategy profile in SAP (Transaction code: SPRO). Navigate to the relevant section for production planning and check if the dispatching sequence is defined
Get instant SAP help. Sign up for our Free Essentials Plan.
CY695
Component & with rqmts date & and rqmts quantity & not available
What causes this issue? Although there is remaining available capacity at the calculated point in time &V2& but not the material components r...
CY694
No components exist
What causes this issue? According to the strategy profile you intend to carry out a material availability check. However, no material components are ...
CY697
Assignment of requirements grouping & to a chart is not possible
What causes this issue? The assignment of the requirements grouping &V1& to a chart cannot be carried out.System Response The callup of the ...
CY698
& & & &
What causes this issue? Error/problem in accessing planning table, which is of a temporary nature. This means that it has not yet been established on...