Do you have any question about this error?
Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 020
Message text: Error in date format for start date of evaluations
On reading the profiles the start date for the evaluations is changed
to an internal representation of the date for the display. Here an
error has occurred (for example through an incorrect entry).
The application is interrupted.
Check the start date in the settings profile via customizing for
capacity planning.
Error message extract from SAP system. Copyright SAP SE.
CY020
- Error in date format for start date of evaluations ?The SAP error message CY020 indicates that there is an issue with the date format for the start date of evaluations in the context of SAP Controlling (CO) or other related modules. This error typically arises when the date entered does not conform to the expected format or is invalid.
Cause:
- Incorrect Date Format: The date may be entered in a format that is not recognized by the system. For example, if the system expects a date in the format
DD.MM.YYYY
and the user enters it asMM/DD/YYYY
, this error will occur.- Invalid Date: The date entered may not be a valid calendar date (e.g., February 30).
- User Profile Settings: The date format settings in the user profile may differ from the expected format in the transaction.
- System Locale Settings: The system's locale settings may not match the date format being used.
Solution:
- Check Date Format: Ensure that the date is entered in the correct format as per the system's requirements. Typically, this is
DD.MM.YYYY
or as specified in your SAP configuration.- Validate the Date: Make sure that the date you are entering is a valid date. For example, check for leap years or the number of days in a month.
- User Profile Settings: Go to your user profile settings in SAP and check the date format settings. You can do this by navigating to:
- System > User Profile > Own Data (or use transaction code
SU3
).- Check the "Defaults" tab for the date format settings.
- Locale Settings: If you have access, check the system's locale settings to ensure they are set correctly. This may require assistance from your SAP Basis team.
- Re-enter the Date: After confirming the correct format and validity, re-enter the date in the appropriate field.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or technical team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
CY019
Error when determining the first day in a calendar week
What causes this issue? When the system tried to find the first day of a calendar week, an error occurred. The week specification is not correct.Sys...
CY018
Error when determining the calendar week
What causes this issue? When the system attempted to convert a date to a calendar week, an error occurred. The date must be between 01/01/92 and 12/...
CY021
Error in date format for finish date of evaluations
What causes this issue? On reading the profiles the finish date for the evaluations is changed to an internal representation of date for the display....
CY022
Error in date format for dispatching of backlog
What causes this issue? On reading the profiles the entry for the date for dispatching the backlog is converted to a specific date. Here an error has...
Click on this link to search all SAP messages.