Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 019
Message text: Error when determining the first day in a calendar week
When the system tried to find the first day of a calendar week, an
error occurred. The week specification is not correct.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check your entry and enter a correct format for the week.
Error message extract from SAP system. Copyright SAP SE.
CY019
- Error when determining the first day in a calendar week ?The SAP error message CY019 typically occurs when there is an issue with determining the first day of the calendar week in the context of time management or planning. This error can arise due to various reasons, including configuration issues, missing data, or incorrect settings in the calendar or date formats. Causes of CY019 Error Calendar Configuration: The calendar settings in the system may not be properly configured. This includes the definition of the week start day (e.g., Sunday or Monday) and the calendar year. Missing or Incorrect Data: There may be missing entries in the calendar tables or incorrect data that prevents the system from determining the first day of the week. User Parameters: User-specific settings or parameters may not be set correctly, leading to discrepancies in how the system interprets the week start. Time Zone Issues: If the system is set up to handle multiple time zones, discrepancies in time zone settings can
Get instant SAP help. Sign up for our Free Essentials Plan.
CY018
Error when determining the calendar week
What causes this issue? When the system attempted to convert a date to a calendar week, an error occurred. The date must be between 01/01/92 and 12/...
CY017
Error when determining the posting period
What causes this issue? As the period type, you selected "posting periods". This means that a date must be converted to a posting period. ...
CY020
Error in date format for start date of evaluations
What causes this issue? On reading the profiles the start date for the evaluations is changed to an internal representation of the date for the displ...
CY021
Error in date format for finish date of evaluations
What causes this issue? On reading the profiles the finish date for the evaluations is changed to an internal representation of date for the display....
Click on this link to search all SAP messages.