Do you have any question about this error?
Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 022
Message text: Error in date format for dispatching of backlog
On reading the profiles the entry for the date for dispatching the
backlog is converted to a specific date. Here an error has occurred
The application is terminated.
Check the date for dispatching the backlog in the settings profile via
customizing for capacity planning.
Error message extract from SAP system. Copyright SAP SE.
CY022
- Error in date format for dispatching of backlog ?The SAP error message CY022, which indicates "Error in date format for dispatching of backlog," typically arises when there is an issue with the date format being used in the system. This error can occur in various contexts, such as during the processing of production orders, scheduling, or when managing backlog in the system.
Causes:
- Incorrect Date Format: The date format specified in the user profile or in the system settings does not match the expected format for the operation being performed.
- Invalid Date Values: The date values being entered may be invalid (e.g., a date that does not exist, such as February 30).
- Localization Settings: The system may be configured for a different locale, leading to discrepancies in date formats.
- Data Entry Errors: Manual entry of dates may lead to typographical errors or incorrect formats.
Solutions:
Check User Profile Settings:
- Go to the user profile settings and verify the date format. Ensure it matches the expected format (e.g., DD/MM/YYYY or MM/DD/YYYY).
- You can access this by navigating to
SU01
(User Maintenance) and checking the "Defaults" tab.Verify System Settings:
- Check the system-wide date format settings in transaction
SPRO
(Customizing) underGeneral Settings
->Set Countries
->Define Date Formats
.- Ensure that the date format aligns with the expected input for the transaction you are working with.
Validate Input Data:
- Review the dates being entered for any invalid values or formats. Ensure that all dates are valid and conform to the expected format.
Localization Settings:
- If your organization operates in multiple countries, ensure that the localization settings are correctly configured for the specific region you are working in.
Use Standard Date Input:
- When entering dates, use the standard date input method provided by SAP (e.g., using the calendar picker) to avoid format issues.
Consult Documentation:
- Refer to SAP documentation or help files for specific guidance on date formats and any related configuration settings.
Related Information:
SE11
(Data Dictionary) to check table structures or SE37
(Function Module) to analyze function modules related to date handling.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP Basis or technical support team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
CY021
Error in date format for finish date of evaluations
What causes this issue? On reading the profiles the finish date for the evaluations is changed to an internal representation of date for the display....
CY020
Error in date format for start date of evaluations
What causes this issue? On reading the profiles the start date for the evaluations is changed to an internal representation of the date for the displ...
CY023
Error when calculating the evaluation period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CY024
Error when calculating the data base reading period
What causes this issue? The selection profile contains data concerning the period for which data is read from the database. An error has occurred in ...
Click on this link to search all SAP messages.