Message type: E = Error
Message class: CRM_UBB_PREBILLING - Messages for Prebilling
Message number: 226
Message text: Contract &1 item &2 will not be included in pool prebilling
Redistribution item &V2& for contract &V1& is not included in pool
prebilling. Either not all of the corresponding usage items in the
contract are prebilled, or they are blocked for billing, or the
redistribution item itself is blocked for billing.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If you want to include this redistribution item in pool prebilling, then
all usage periods for the single contract must be prebilled for this
period. This is done by entering a valid counter reading for the usage
items that are not yet prebilled, or by manually entering the volume in
the usage volume overview of the contract. Furthermore, the relevant
usage items and redistribution items must not be blocked for billing.
Error message extract from SAP system. Copyright SAP SE.
CRM_UBB_PREBILLING226
- Contract &1 item &2 will not be included in pool prebilling ?The SAP error message CRM_UBB_PREBILLING226 indicates that a specific contract item will not be included in the pool prebilling process. This error typically arises in the context of SAP Customer Relationship Management (CRM) and can be related to various factors concerning the contract or billing setup. Causes: Contract Status: The contract or item may be in a status that does not allow it to be billed. For example, if the contract is not active or is in a draft state, it may not be eligible for prebilling. Billing Block: There may be a billing block set on the contract or item, preventing it from being included in the billing process. Item Type: The item type may not be configured for billing in the system. Certain item categories may be excluded from billing processes. Billing Plan Issues: If the billing plan associated with the contract item is not set up correctly or is missing, it can
Get instant SAP help. Sign up for our Free Essentials Plan.
CRM_UBB_PREBILLING225
Contract &1 item &2 will be included in pool prebilling
What causes this issue? Redistributition item &V2& in contract &V1& is taken into account in pool prebilling. All the corresponding u...
CRM_UBB_PREBILLING224
Pool contract &1 (billing request) item &2 is locked for billing
What causes this issue? Item &V2& in pool contract &V1& is locked for billing.System Response This is an information message. The pr...
CRM_UBB_PREBILLING227
Pool redistribution performed for contract &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CRM_UBB_PREBILLING228
An error occurred during redistribution for a processing block
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
Click on this link to search all SAP messages.