Do you have any question about this error?
Message type: E = Error
Message class: CRM_UBB_PREBILLING - Messages for Prebilling
Message number: 225
Message text: Contract &1 item &2 will be included in pool prebilling
Redistributition item &V2& in contract &V1& is taken into account in
pool prebilling. All the corresponding usage items in the contract are
prebilled.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CRM_UBB_PREBILLING225
- Contract &1 item &2 will be included in pool prebilling ?The SAP error message CRM_UBB_PREBILLING225 indicates that a specific contract item is being included in the pool prebilling process. This message is typically related to the billing process in SAP Customer Relationship Management (CRM) and can arise in scenarios where there are issues with contract items that are set to be billed.
Cause:
The error message can be triggered by several factors, including:
- Contract Configuration Issues: The contract item may not be properly configured for billing, or there may be missing or incorrect data in the contract.
- Billing Plan Issues: The billing plan associated with the contract item may not be set up correctly, leading to issues during the prebilling process.
- Status of Contract Item: The status of the contract item may not allow it to be included in the billing process (e.g., it may be in a status that prevents billing).
- Data Inconsistencies: There may be inconsistencies in the data related to the contract or its items, such as missing mandatory fields.
Solution:
To resolve the issue, you can take the following steps:
Check Contract Configuration:
- Review the contract and its items to ensure that all necessary fields are filled out correctly.
- Ensure that the contract item is set up for billing and that the billing type is appropriate.
Review Billing Plan:
- Check the billing plan associated with the contract item to ensure it is correctly configured.
- Make sure that the billing frequency and other parameters are set correctly.
Verify Status:
- Check the status of the contract item to ensure it is eligible for billing. If the status is incorrect, you may need to change it to allow billing.
Data Consistency Check:
- Run consistency checks on the contract and its items to identify any missing or incorrect data.
- Correct any inconsistencies found during the checks.
Consult Documentation:
- Refer to SAP documentation or help resources for specific details related to the error message and its implications.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
CRMD_ORDER
to view and edit contracts or VF01
for billing documents.By following these steps, you should be able to identify the root cause of the error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CRM_UBB_PREBILLING224
Pool contract &1 (billing request) item &2 is locked for billing
What causes this issue? Item &V2& in pool contract &V1& is locked for billing.System Response This is an information message. The pr...
CRM_UBB_PREBILLING223
Error in BAdI for credit sorting
What causes this issue? In the BAdI for credit sorting that defines the sequence in which the credit is to be used, a disallowed change has been made...
CRM_UBB_PREBILLING226
Contract &1 item &2 will not be included in pool prebilling
What causes this issue? Redistribution item &V2& for contract &V1& is not included in pool prebilling. Either not all of the correspo...
CRM_UBB_PREBILLING227
Pool redistribution performed for contract &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.