Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 805
Message text: Material &1 plant &2: setup time cannot be converted to base unit
You want to update scheduling data for material &V1& in plant &V2&.
However, this is not possible for setup time because an error (for
example, field overflow) occurred while converting the base unit of
measure in the routing to the base unit of measure in the material
master.
Check the base units of measure in the material master and routing.
Error message extract from SAP system. Copyright SAP SE.
CP805
- Material &1 plant &2: setup time cannot be converted to base unit ?The SAP error message CP805 indicates that there is an issue with the setup time for a material in a specific plant. The error message reads: "Material &1 plant &2: setup time cannot be converted to base unit." This typically occurs in the context of production planning and control, particularly when dealing with routing and work center data.
Cause: Unit of Measure (UoM) Issues: The setup time defined for the material in the routing or work center may be in a different unit of measure than what is expected or defined in the material master or work center. Configuration Errors: There may be inconsistencies in the configuration of the work center or routing, such as incorrect definitions of base units of measure. Data Entry Errors: Manual entry errors when defining setup times in the routing or work center can lead to this issue. Missing Conversion Factors: If the conversion factors between the units of measure
Get instant SAP help. Sign up for our Free Essentials Plan.
CP804
Material &1 Plant &2: Proc. time cannot be converted to base unit
What causes this issue? You want to update the scheduling data for material &V1& in plant &V2&. However, this is not possible for the...
CP803
Material & in plant & currently being edited.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP806
Material &1 plant &2: Interop. time cannot be converted to base unit
What causes this issue? You want to update the scheduling data for material &V1& in plant &V2&. However, this is not possible for int...
CP807
Select "Update material master directly"
What causes this issue? You want to update the material master record with the scheduling results from the routing and copy the assembly scrap determ...
Click on this link to search all SAP messages.