Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 803
Message text: Material & in plant & currently being edited.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CP803
- Material & in plant & currently being edited. ?The SAP error message CP803 typically indicates that a material in a specific plant is currently being edited or is locked by another user or process. This can occur in various scenarios, such as when multiple users are trying to access or modify the same material master data simultaneously.
Cause:
- Concurrent Access: Another user is currently editing the material in the same plant.
- Locking Mechanism: SAP uses a locking mechanism to prevent data inconsistencies. If a user is editing a material, it will be locked for others until the editing session is completed.
- Background Jobs: A background job might be running that is accessing the material, causing it to be locked.
- Transaction Errors: An error in a previous transaction may have left the material in a locked state.
Solution:
- Wait and Retry: If another user is editing the material, wait for them to finish and then try again.
- Check Lock Entries: Use transaction code
SM12
to check for lock entries. You can see which user or process is holding the lock on the material. If necessary, you can delete the lock entry (if you have the appropriate permissions) to release it.- Communicate with Users: If you identify another user is editing the material, communicate with them to understand when they will finish.
- Review Background Jobs: Check if there are any background jobs that might be locking the material. You can use transaction code
SM37
to monitor background jobs.- Transaction Code: If you are in the middle of a transaction and encounter this error, ensure that you complete or cancel the transaction properly.
- System Restart: In rare cases, a system restart may be necessary if the lock persists due to a system issue.
Related Information:
SM12
- To view and manage lock entries.SM37
- To monitor background jobs.SE11
- To check the data dictionary for the material master table.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP Basis team or technical support for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
CP802
Material &1 in plant &2 was not updated due to incorrect selection
What causes this issue? You have marked more than one data record with scheduling results for material &V1& in plant &V2&. If you wa...
CP801
Markings for material & plant & are in process.
What causes this issue? You are attempting to update the material master for production scheduler &V1& in plant &V2& with the schedul...
CP804
Material &1 Plant &2: Proc. time cannot be converted to base unit
What causes this issue? You want to update the scheduling data for material &V1& in plant &V2&. However, this is not possible for the...
CP805
Material &1 plant &2: setup time cannot be converted to base unit
What causes this issue? You want to update scheduling data for material &V1& in plant &V2&. However, this is not possible for setup t...
Click on this link to search all SAP messages.