Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 804
Message text: Material &1 Plant &2: Proc. time cannot be converted to base unit
You want to update the scheduling data for material &V1& in plant &V2&.
However, this is not possible for the processing time because an error
(for example, field overflow) occurred while converting the base unit
of measure in the routing to the base unit of measure in the material
master.
Check base units of measure in the material master and routing.
Error message extract from SAP system. Copyright SAP SE.
CP804
- Material &1 Plant &2: Proc. time cannot be converted to base unit ?The SAP error message CP804 indicates that there is an issue with the processing time of a material in a specific plant. This error typically arises when the processing time defined for a material cannot be converted to the base unit of measure. Here’s a breakdown of the cause, potential solutions, and related information:
Cause: Inconsistent Units of Measure: The processing time may be defined in a unit that is not compatible with the base unit of measure for the material. For example, if the processing time is defined in hours but the base unit is in minutes, the system may not be able to convert it correctly. Missing Configuration: There may be missing or incorrect configuration in the material master or the work center that defines how processing times are calculated and converted. Data Entry Errors: There could be errors in the data entry for the processing time in the material master or
Get instant SAP help. Sign up for our Free Essentials Plan.
CP803
Material & in plant & currently being edited.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP802
Material &1 in plant &2 was not updated due to incorrect selection
What causes this issue? You have marked more than one data record with scheduling results for material &V1& in plant &V2&. If you wa...
CP805
Material &1 plant &2: setup time cannot be converted to base unit
What causes this issue? You want to update scheduling data for material &V1& in plant &V2&. However, this is not possible for setup t...
CP806
Material &1 plant &2: Interop. time cannot be converted to base unit
What causes this issue? You want to update the scheduling data for material &V1& in plant &V2&. However, this is not possible for int...
Click on this link to search all SAP messages.