Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 807
Message text: Select "Update material master directly"
You want to update the material master record with the scheduling
results from the routing and copy the assembly scrap determined.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
You must also select the indicator <DS:DE.FLG_MAT_MU>Update material
master directly</>.
Error message extract from SAP system. Copyright SAP SE.
CP807
- Select "Update material master directly" ?The SAP error message CP807, which states "Select 'Update material master directly'", typically occurs in the context of material master data updates in SAP. This error is often encountered when trying to perform a mass change or update to material master records, and it indicates that the system requires a specific setting to be enabled for the update to proceed.
Cause: The error CP807 usually arises due to one of the following reasons: Incorrect Update Mode: The system is set to a mode that does not allow direct updates to the material master. This can happen if the update mode is set to a batch or indirect update. Missing Authorization: The user may not have the necessary authorizations to perform direct updates on the material master. Configuration Settings: The configuration settings in the material master update process may not be set correctly, leading to this error.
Solution: To resolve the CP807 error, you can take the following
Get instant SAP help. Sign up for our Free Essentials Plan.
CP806
Material &1 plant &2: Interop. time cannot be converted to base unit
What causes this issue? You want to update the scheduling data for material &V1& in plant &V2&. However, this is not possible for int...
CP805
Material &1 plant &2: setup time cannot be converted to base unit
What causes this issue? You want to update scheduling data for material &V1& in plant &V2&. However, this is not possible for setup t...
CP808
The configurable material & plant & was not taken into account
What causes this issue? You want to schedule routings and then copy the resulting internal processing times into the material master. However, materi...
CP810
You do not have an authorization for plant &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.