Do you have any question about this error?
Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 767
Message text: Distribution is not taken into account for manual requirement dates
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CN767
- Distribution is not taken into account for manual requirement dates ?The SAP error message CN767, which states "Distribution is not taken into account for manual requirement dates," typically occurs in the context of project management and material requirements planning (MRP) within SAP. This error indicates that the system is unable to consider the distribution of requirements when manual dates are set for a project or order.
Cause:
- Manual Requirement Dates: The error often arises when manual dates are entered for a project or order, and the system is unable to apply the distribution logic to these manually set dates.
- Configuration Settings: There may be specific configuration settings in the project system or MRP that prevent the distribution of requirements from being applied when manual dates are used.
- Project Structure: The structure of the project or the way the requirements are defined may not allow for distribution to be applied correctly.
- Missing Parameters: Certain parameters or settings related to the distribution of requirements may not be properly defined in the system.
Solution:
- Review Manual Dates: Check the manual requirement dates that have been set. If possible, consider using the system-generated dates instead of manual dates to allow the distribution logic to function correctly.
- Check Configuration: Review the configuration settings in the project system (transaction code OPUK) and MRP (transaction code OMD0) to ensure that the distribution of requirements is enabled and correctly set up.
- Adjust Project Structure: If the project structure is causing the issue, consider adjusting the way requirements are defined or structured within the project.
- Use Standard Functions: Instead of manually entering dates, use standard SAP functions for scheduling and planning to ensure that the distribution logic is applied.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling requirement distributions and manual dates.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP project management and MRP.
Get instant SAP help. Start your 7-day free trial now.
CN766
Info record &1 flagged for deletion
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN765
Long text for element & activity & could not be copied
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN768
Procurement indicator and material master settings for & are inconsistent
What causes this issue? You assigned a material component in the network. At the same time you are using the determination of stock allocation and ac...
CN769
WBS element &1 has different inventory valuation
What causes this issue? The project definition for WBS element &V1& only allows the following stock control: No project stock No project stoc...
Click on this link to search all SAP messages.