Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 769
Message text: WBS element &1 has different inventory valuation
The project definition for WBS element &V1& only allows the following
stock control:
No project stock
No project stock with defined valuation &V2&
' ' = non-valuated project stock
'M' = valuated project stock
Account assignment not possible.
Change the settings for the project stock in the project definition (
<LS>Control</> tab) or use a suitable WBS element.
Error message extract from SAP system. Copyright SAP SE.
CN769
- WBS element &1 has different inventory valuation ?The SAP error message CN769 indicates that there is a discrepancy in the inventory valuation for a Work Breakdown Structure (WBS) element. This typically occurs when the WBS element is associated with different valuation methods or settings in the system, leading to inconsistencies in how costs are calculated or reported.
Cause:
- Different Valuation Methods: The WBS element may be linked to different valuation methods (e.g., standard costing vs. moving average) in different contexts (e.g., project vs. order).
- Configuration Issues: There may be configuration settings in the controlling area or project settings that are not aligned.
- Data Entry Errors: Manual entries or changes in the project structure or cost elements may lead to inconsistencies.
- Integration Issues: If the WBS element is integrated with other modules (like MM or SD), discrepancies can arise from different valuation settings in those modules.
Solution:
- Check WBS Element Settings: Review the settings of the WBS element in the Project System (PS) module to ensure that the valuation method is consistent with the overall project settings.
- Review Cost Elements: Ensure that the cost elements associated with the WBS element are configured correctly and consistently.
- Standardize Valuation Methods: If different valuation methods are being used, consider standardizing them across the relevant WBS elements and cost objects.
- Consult Configuration: Work with your SAP configuration team to review the settings in the controlling area and project settings to ensure they are aligned.
- Data Consistency Check: Run consistency checks in the system to identify any discrepancies in the data related to the WBS element.
- Documentation and Training: Ensure that users are trained on the correct procedures for entering and managing WBS elements to minimize manual errors.
Related Information:
By following these steps, you should be able to identify the cause of the CN769 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CN768
Procurement indicator and material master settings for & are inconsistent
What causes this issue? You assigned a material component in the network. At the same time you are using the determination of stock allocation and ac...
CN767
Distribution is not taken into account for manual requirement dates
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN770
Errors occurred during processing (see error log)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN771
Network &1 and project &2 have been summarized in different ways
What causes this issue? Network &V1& is assigned to project &V2&. The network and project, however, have different types of summariza...
Click on this link to search all SAP messages.