Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 490
Message text: Work for activity & is too large - check
When you multiply using the execution factor for work in activity &V1&,
you get a value which is too large.
INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TX
Enter a lower value for the execution factor in the activity.
Error message extract from SAP system. Copyright SAP SE.
CN490
- Work for activity & is too large - check ?The SAP error message CN490 indicates that the work for a specific activity is too large and needs to be checked. This error typically arises in the context of project management and controlling, particularly when dealing with network activities in SAP Project System (PS).
Cause:
- Excessive Work Allocation: The work assigned to an activity exceeds the limits set in the system. This could be due to incorrect data entry or misconfiguration in the project planning.
- Capacity Constraints: The resources assigned to the activity may not have enough capacity to handle the workload.
- Incorrect Planning Parameters: The planning parameters for the project or activity may not be set correctly, leading to unrealistic work estimates.
- Resource Availability: The resources required for the activity may not be available, causing the system to flag the work as excessive.
Solution:
- Review Activity Details: Check the details of the activity in question. Look for any discrepancies in the work estimates or resource assignments.
- Adjust Work Estimates: If the work estimate is indeed too high, adjust it to a more realistic figure based on the project requirements and resource capabilities.
- Check Resource Availability: Ensure that the resources assigned to the activity are available and can handle the workload. If necessary, reassign resources or adjust their availability.
- Modify Planning Parameters: Review and modify the planning parameters for the project or activity to ensure they align with the actual project requirements.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on managing work estimates and activity planning.
Related Information:
CJ20N
(Project Builder) or CN41
(Project Overview) to analyze project activities and their respective workloads.Get instant SAP help. Start your 7-day free trial now.
CN489
Activity & element & is taking too much time - please check
What causes this issue? If the system multipies the execution factor in activity &V1& by the duration in activity element &V2&, the p...
CN488
Costs of activity & element & are becoming too large - please check
What causes this issue? If the system multipies the execution factor in activity &V1& by the costs in activity element &V2&, the prod...
CN491
Duration for activity & is too large - check
What causes this issue? When you multiply with the execution factor for duration in activity &V1&, you get a value which is too large.System ...
CN492
Work for activity & element & is too large - check
What causes this issue? When you multiple using the execution factor for work in activity &V1& gives you a value which is too large for activ...