Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 488
Message text: Costs of activity & element & are becoming too large - please check
If the system multipies the execution factor in activity &V1& by the
costs in activity element &V2&, the product is too large.
INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TX
Enter a smaller execution factor in the activity.
Error message extract from SAP system. Copyright SAP SE.
CN488
- Costs of activity & element & are becoming too large - please check ?The SAP error message CN488 indicates that the costs associated with a specific activity and cost element are exceeding a predefined limit. This can occur in various contexts, such as project management, production planning, or cost accounting, where costs are tracked and managed.
Cause: High Activity Costs: The costs associated with the activity or cost element may be unusually high due to increased resource usage, labor costs, or material costs. Configuration Limits: There may be a configuration setting in the system that defines a maximum allowable cost for certain activities or cost elements. Data Entry Errors: Incorrect data entry or misconfiguration in the master data (e.g., cost centers, activity types) can lead to inflated costs. Accumulated Costs: If costs have been accumulating over time without proper monitoring, they may exceed the threshold set in the system.
Solution: Review Activity Costs: Check the detailed breakdown of costs associated with the activity and cost element. Identify any unusual spikes
Get instant SAP help. Sign up for our Free Essentials Plan.
CN487
The exection factor in the network has been reduced from & to 1
What causes this issue? The quantity you entered in the network would lead to an execution factor of &V1&. The execution factor cannot exceed...
CN486
BAdI NETW_USER_FIELDS_F4 inactive: There is no user-defined F4 help
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN489
Activity & element & is taking too much time - please check
What causes this issue? If the system multipies the execution factor in activity &V1& by the duration in activity element &V2&, the p...
CN490
Work for activity & is too large - check
What causes this issue? When you multiply using the execution factor for work in activity &V1&, you get a value which is too large.System Res...