Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 491
Message text: Duration for activity & is too large - check
When you multiply with the execution factor for duration in activity
&V1&, you get a value which is too large.
INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TX
Enter a lower value for the execution factor in the activity.
Error message extract from SAP system. Copyright SAP SE.
CN491
- Duration for activity & is too large - check ?The SAP error message CN491 ("Duration for activity & is too large - check") typically occurs in the context of project management and network planning within SAP. This error indicates that the duration specified for a particular activity exceeds the allowable limits set in the system.
Cause:
- Excessive Duration: The most common cause is that the duration entered for the activity is greater than what the system allows. This could be due to a manual entry error or a misunderstanding of the project requirements.
- System Settings: The system may have predefined limits for activity durations based on configuration settings or project parameters.
- Data Type Limitations: The data type used for storing duration values may have a maximum limit, and exceeding this limit will trigger the error.
Solution:
- Check Activity Duration: Review the duration entered for the activity in question. Ensure that it is within a reasonable range and does not exceed the maximum limit set by the system.
- Adjust Project Settings: If the duration is indeed valid but exceeds the system's limits, consider adjusting the project settings or configuration to allow for longer durations if necessary.
- Break Down Activities: If the activity duration is inherently long, consider breaking it down into smaller, more manageable sub-activities. This can help in adhering to the system's limits while still capturing the full scope of work.
- Consult Documentation: Refer to SAP documentation or consult with your SAP administrator to understand the specific limits and configurations that may be affecting your project.
Related Information:
CJ20N
(Project Builder) or CN22
(Change Network) to access and modify project activities.If the problem persists after checking these aspects, it may be beneficial to reach out to your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CN490
Work for activity & is too large - check
What causes this issue? When you multiply using the execution factor for work in activity &V1&, you get a value which is too large.System Res...
CN489
Activity & element & is taking too much time - please check
What causes this issue? If the system multipies the execution factor in activity &V1& by the duration in activity element &V2&, the p...
CN492
Work for activity & element & is too large - check
What causes this issue? When you multiple using the execution factor for work in activity &V1& gives you a value which is too large for activ...
CN493
Quantity of component & is too large - check
What causes this issue? When you multiply using the execution factor in the activity, you get a value for material component &V1& which is to...
Click on this link to search all SAP messages.