Message type: E = Error
Message class: CKMLMV - Message class for quantity structure tool
Message number: 022
Message text: A target BOM was created for the procurement process
You have performed multi-level material settlement with the indicator
<DS:DE.CKML_CUTBOM>Reduced actual BOM</> set.
Therefore, target BOMs have to be created for procurement alternatives
containing errors (negative prices or exceeding the percentage
threshold value).
Input materials enter a procurement alternative that contains errors
through this procurement process:
Plant : &v2&
Material : &v3&
Procurement process : &v4&
Internal number : &v1&
A target BOM was determined for this procurement process. Therefore,
the only materials that will appear in the procurement process are
those materials that also appear in the target BOM. Consumption
quantities taken are the smaller quantity between the actual BOM and
the target BOM.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CKMLMV022
- A target BOM was created for the procurement process ?The SAP error message CKMLMV022 indicates that a target Bill of Materials (BOM) was created for the procurement process, which typically occurs in the context of Material Ledger and inventory management. This error can arise during the execution of certain transactions related to material valuation or when trying to perform a material movement that involves a BOM.
Cause:
The error usually occurs due to one of the following reasons:
- BOM Configuration: The target BOM is not properly configured or is missing necessary components.
- Material Master Data: The material master data may not be set up correctly for the materials involved in the transaction.
- Procurement Process: The system is expecting a specific BOM for the procurement process, but it is either not found or not valid.
- Versioning Issues: There may be issues with the versioning of the BOM, where the system is trying to access a version that is not active or does not exist.
Solution:
To resolve the CKMLMV022 error, you can take the following steps:
Check BOM Configuration:
- Go to the BOM transaction (CS01, CS02, or CS03) and verify that the target BOM exists and is correctly configured.
- Ensure that all components of the BOM are valid and available.
Review Material Master Data:
- Check the material master data for the materials involved in the transaction. Ensure that the procurement type, valuation class, and other relevant fields are correctly set.
- Use transaction MM03 to view the material master data.
Validate BOM Versions:
- Ensure that the correct version of the BOM is active. You can check this in the BOM transaction by looking at the validity dates and status of the BOM.
Check for Missing Components:
- If the BOM is incomplete or has missing components, you may need to add the necessary components to the BOM.
Consult Documentation:
- Review SAP documentation or notes related to the specific error message for any additional guidance or updates.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance. They may provide specific notes or patches that address the issue.
Related Information:
By following these steps, you should be able to identify the root cause of the CKMLMV022 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CKMLMV021
Multilevel price determination with a reduced actual BOM
What causes this issue? You have performed multi-level price determination with the indicator <DS:DE.CKML_CUTBOM>Reduced actual BOM</> se...
CKMLMV020
Step &1: Packet &2 is first costed with the actual BOM
INCLUDE CKMLMV021 OBJECT DOKU ID NA LANGUAGE ENError message extract from SAP system. Copyright SAP SE. ...
CKMLMV023
Procurement alternative does not need to be corrected
What causes this issue? You have performed multi-level price determination with the indicator <DS:DE.CKML_CUTBOM>Reduced actual BOM</> se...
CKMLMV024
Material sucessfully costed with reduced BOM
What causes this issue? You have performed multi-level price determination with the indicator <DS:DE.CKML_CUTBOM>Reduced actual BOM</>.Sy...
Click on this link to search all SAP messages.